At a glance
- Location
- Tacoma, Washington
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
Past emergencies and the operating plan
FEMA includes Pierce County in DR-4906-WA for the severe-storm and flooding incident during December 5–19, 2025. Check receiving, utilities and food movement independently so the county history is not used as one condition report for every kitchen.
Construction scope before equipment selection
The December 6, 2018 main-kitchen renovation award at the Puget Sound healthcare system in Seattle supplies an institutional construction example. Ask which shared systems and preparation functions become unavailable together.
Renovation and the meal-service sequence
A January 18, 2020 Seattle canteen-kitchen drain-repair award illustrates a narrower system scope. A restaurant group should identify which tasks can genuinely move between locations rather than assume a second property automatically supplies a complete alternative operation.
Equipment access and placement
For a restaurant program, verify each location's capacity and assign any food or utensil transfer explicitly.
Compare the complete temporary-kitchen cost
Compare the same menu duties, equipment periods and support tasks. Historical hospital awards are not restaurant rental rates; written proposals should make clear what the provider includes and what remains with each restaurant operator.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Tacoma location reference
General geographic reference centered on the Census representative point for Tacoma city. This map does not mark a company office.
- Geographic name
- Tacoma city
- State
- Washington (WA)
- Land area
- 49.79 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More Washington kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
Restaurant groups need actual capacity confirmed at each location. A shared brief should coordinate duties while preserving separate menus, connections and receiving conditions.
Deployment coordination
Prepare separate deployment details for the affected restaurants.
24/7 emergency inquiries
Identify the priority operation through the confirmed 24/7 contact.
End-to-end project support
Coordinate shared tasks without assuming spare capacity at another site.
Flexible rental terms
Compare extensions and moves against each permanent handover.
Heavy-duty commercial equipment
Match configurations to the actual menu and washing responsibilities.
Experienced logistics coordination
Confirm receiving and any food or utensil transfers between properties.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
Can another restaurant automatically become the preparation site?
Confirm capacity, duties and the actual operating arrangement first. Identify the preparation, washing, storage and service tasks the room would take over. The operator and responsible authority must review its actual suitability and supporting systems before it becomes the fallback plan.
Which charges may repeat when equipment moves?
Delivery, setup, connections, cleaning and removal. List every planned placement and collection, including connections, cleaning and any repeat setup. Ask which charges recur and how the term changes between locations instead of assuming a single move price.
What makes proposals comparable?
The same menu, service periods, access conditions and supporting responsibilities. Give our team the same service duties, dates and site information, then compare itemized inclusions and exclusions. A lower equipment line can leave connections, washing, storage or removal outside the proposed price.
What should the restaurant program include for intersite food transfers?
Identify the actual preparation and service addresses, transport responsibility, receiving contacts and utensil return. Have the operator resolve capacity and the required review before treating another restaurant as part of the temporary meal arrangement.
Who coordinates any intersite transfer?
Assign food and utensil movement in the shared brief. Identify where prepared meals are received, held and handed to users, and where utensils go afterward. Assign those duties even if the main production room is located elsewhere.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- Treasury award record: VISN 20 CONSTRUCTION IDIQ MATOC TASK ORDER UNDER 36C26018D0007 FOR TO RENOVATE THE MAIN KITCHEN AT P
- Treasury award record: ***EMERGENCY*** CANTEEN KITCHEN DRAIN REPAIR - SEATTLE VAMC
- FEMA historical county designation and incident dates
- FDA Food Code: model provisions; local adoption and authority must be checked
- FDA: state food-safety resources






