Commercial food-service equipment

12ft Commercial Refrigerated Trailer Rentals

Starting from $1,895 / month

Compare this trailer when replacement storage has to fit into a constrained receiving area. Tell us the food load, required storage conditions, door-opening pattern and dates. The operating specification and electrical connection are confirmed for the proposed unit before selection; nominal length does not establish usable capacity. Include the dates, food load, receiving pattern and available electrical service in your inquiry. We can then discuss the proposed equipment and the conditions that need confirmation in the rental quote.

Refrigerated trailer exterior — shared configuration reference. Equipment is confirmed with your quote.

12ft Refrigerated Trailer reference photographs

Use Previous, Next, or the left and right arrow keys to browse. Press Escape to close.

1 / 4 — Refrigerated trailer exterior — shared configuration reference

Shared configuration references. The assigned equipment and current configuration are confirmed with your quote.

Check against your operation

12ft Refrigerated Trailer specifications

Configuration
12ft Refrigerated Trailer
Electrical requirements
Specifications by quote
  • Specifications by quote

Confirm the assigned equipment, connection details, working clearances and included accessories with your quote. Recorded temperature points are not verified operating ranges. Internal dimensions, usable capacity, ambient limits and loading conditions are confirmed for the proposed model.

12ft Refrigerated Trailer floor plan

A floor plan for this unit is available on request. Contact us and we will send the current layout for this configuration.

12ft Refrigerated Trailer rental prices

12ft Refrigerated Trailer — rental price ranges
Customer tier1-6 Days8 Days-14 days15days-1 monthMore than 3 Months
Tier 1$1,495$1,695$1,995$2,195
Tier 2-4$1,295$1,595$1,895$1,995

Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.

Get an itemized rental quoteOpens inquiry form

Inspect the equipment references

A closer look at the work areas

Refrigerated trailer exterior — shared configuration reference. Equipment is confirmed with your quote.
Refrigerated storage interior
Refrigerated storage interior — shared configuration reference
Interior cooling equipment
Interior cooling equipment — shared configuration reference
Front refrigeration machinery
Front refrigeration machinery — shared configuration reference

12ft Refrigerated Trailer reference photographs

Use Previous, Next, or the left and right arrow keys to browse. Press Escape to close.

1 / 4 — Refrigerated trailer exterior — shared configuration reference

Shared configuration references. The assigned equipment and current configuration are confirmed with your quote.

Before agreeing a rental or lease

Compare the complete period of use.

Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.

Why choose Water Damage Kitchen

A compact cold-storage option with configuration checks up front. Bring the food load and required storage conditions, operating dates and site details together so the 12ft Refrigerated Trailer proposal fits the work that needs to move.

  • Deployment coordination

    Review 12ft Refrigerated Trailer placement and site readiness early so access or connection work is visible before the delivery arrangement is agreed.

  • 24/7 emergency inquiries

    Reach our staffed phone 24/7 to discuss an urgent cooler or freezer interruption with the facility location and next service period ready.

  • End-to-end project support

    Connect 12ft Refrigerated Trailer selection and setup with operating support, servicing and collection.

  • Flexible rental terms

    Compare every published duration band for the 12ft Refrigerated Trailer, then confirm the applicable customer tier, extensions and exact rental period.

  • Heavy-duty commercial equipment

    Get the proposed equipment and technical requirements in writing before choosing this configuration.

  • Experienced logistics coordination

    Confirm power, connection points, staff access and service clearances for the proposed model as part of the site review.

Clear equipment details and a staffed phone

Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.

Independent public examples

What a temporary kitchen has to work around

These public records show different operating constraints during an interruption. They are independent examples, rather than Water Damage Kitchen customer projects; use their specific lessons alongside the proposed equipment and your actual site.

For refrigerated storage, focus on receiving, the space that remains usable and the reliability of the proposed power supply. These project examples do not establish this model’s capacity or temperature performance; confirm those in its specification.

1. Past emergencies: storage and receiving need usable access

Miami-Dade County declared a flooding emergency effective June 12, 2024. For a kitchen in Miami, include storage placement and receiving in the site check. In Phoenix, September 2014 flooding made I-10 at 43rd Avenue impassable. These historical examples show why an equipment plan also needs a usable approach and current site information. County notice · NWS road account.

2. Construction: keep production separate from live work

UCSF’s November 2026 update in San Francisco describes hospital structural work, utility cutovers and delivery-related traffic changes, with first patients expected in 2030. An occupied-site plan needs its food production, receiving and utility interfaces marked alongside the construction boundary. University construction update.

3. Renovation: identify the work each configuration must replace

A December 2023 award at Birmingham VA covers main-kitchen renovation. For a comparable shutdown, identify which production stations and shared services close together before choosing the temporary cooking line; the building-work package and equipment rental need separate scopes. Public project record.

A September 2011 VA award in Chicago covered replacing the roof over a third-floor kitchen. Overhead work can require a temporary meal arrangement even when cooking appliances remain unchanged. Show the protected work boundary and food-transfer path before selecting equipment. Public project record.

A September 2018 Houston ceiling-replacement contract included dust containment and different finishes for kitchen and dining areas. A comparable plan should separate preparation, service and the construction boundary; moving appliances alone does not define the temporary meal route. Public project record.

The Southwest YMCA in Denver reports completed 2026 renovations with a teaching kitchen and food-pantry space. Its phased plan called for food distribution to continue. Separate teaching, ingredient storage and pantry receiving when defining which functions need temporary equipment during comparable work. Public project record.

Boston’s October 2026 schools address reports an improved central kitchen supporting scratch-cooked breakfast and lunch. A centralized meal plan needs production, packing, transport and serving points defined separately; replacement equipment at one address should fit its actual part in that system. Public project record.

4. Access: agree the actual receiving and operating position

Have the property mark the authorized receiving point, equipment position, staff routes and connection work. Confirm current road restrictions and the delivery arrangement for that address. A public emergency staging site does not establish permission to receive rental equipment there.

5. Rental cost: compare the selected equipment and complete term

Use the full rental bands on this page, then confirm the applicable tier, dates, site work, servicing and collection in your written quote. Keep permanent repair costs separate so a change to building work does not hide an extension or another equipment move.

Kitchen project inquiries · 24/7

A cooler or freezer has failed?

Have the affected storage, food load, required conditions and available power ready for the call. Keep food-safety decisions with the responsible operator and authority while replacement storage is discussed.

Project questions

Before you choose the next step

How do I choose the right configuration?

Send the menu, busiest meal period, cooking methods, largest pans and staff workflow. For washing, include the peak return and rack movement; for refrigeration, include required product conditions and loading. We compare those requirements with the actual equipment list and available site services.

Are delivery and site connections included in the starting price?

The starting figure is a rental comparison, not a complete project total. Delivery, collection, connections, setup, servicing, taxes and minimum terms are confirmed in the written quote. Tell us the facility location, dates and known access constraints so the proposal can identify each responsibility.

Can I discuss an urgent kitchen shutdown?

Yes. Our phone is staffed 24/7. Call with the facility city and state, the work that has stopped, the next meal period and the site information you have. We confirm the proposed equipment, availability and delivery arrangements for the actual project.

What happens if repairs take longer?

Include the expected period and any phased handovers in your inquiry. Confirm extension notice, revised rent, service visits, cleaning and collection in the agreement. Keep temporary equipment available until the permanent operation reaches its agreed handover and any required operating authorization is obtained.

Tell us about your kitchen

Send a project inquiry

Share your location and kitchen questions. Fields marked * are required.

Your contact and project details

Read our Privacy Policy for how the form and its inquiry workflow use your information.

Prefer to talk? Call +1-800-245-5216.

Water Damage Kitchen

Tell us about your kitchen