At a glance
- Location
- Houston, Texas
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
1. Past emergencies and kitchen continuity
FEMA's DR-4798-TX designates Harris County for hurricane beryl, with an incident beginning July 5, 2024. The Harris County Hurricane Beryl designation is historical context; it does not establish the campus's actual damage or operating condition.
2. New dining construction and the meal-service boundary
The University of Houston’s August 2026 Dining Commons briefing describes a new 64,000-square-foot building and records construction at 1% complete at that briefing. Its January 2028 substantial-completion target is a planning date, not confirmation of the project’s present progress. For a campus reviewing temporary cooking capacity during comparable work, identify which existing meal services continue, where deliveries arrive and how prepared food reaches diners. Review those duties with our team before choosing a commercial kitchen trailer rental; the public project record does not establish a Water Damage Kitchen assignment or a rental requirement at the university.
3. Renovation and changeover planning
Historical award record: a federal award signed September 27, 2018 describes different ceiling-material installation in kitchen and eating areas, with cleanup and doorway protection. The record distinguishes kitchen and eating-area ceiling materials. It does not establish which materials or restoration method suit a different incident.
4. Incident instructions and the campus receiving plan
Texas’s January 2025 logistics plan coordinates state resources through district, regional and state emergency operations centers, including readiness to receive and track supplies. Its transportation plan calls for infrastructure-status updates and evacuation/reentry coordination. Obtain current incident instructions for an affected approach, then confirm the campus receiving entrance, authorized contact and servicing position with the property. Public emergency coordination does not itself authorize our rental delivery or designate its destination.
5. Local rental cost questions
Compare Houston building protection and ceiling work separately from temporary kitchen equipment, connections, servicing, extensions, and removal.
The shared rental table below shows equipment reference pricing. For a Houston campus quote, include the delivery address, receiving entrance and rental dates, along with any vehicle-access or unloading restrictions the campus has confirmed. Ask for delivery, setup, utility connections, servicing and pickup to be itemized for that destination and schedule.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Houston location reference
General geographic reference centered on the Census representative point for Houston city. This map does not mark a company office.
- Geographic name
- Houston city
- State
- Texas (TX)
- Land area
- 640.82 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More Texas kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
Commercial kitchen planning in Houston needs an operating brief and equipment information for the actual facility. Connect food protection with preparation and dining circulation.
Deployment coordination
Define overhead-work boundaries before discussing replacement timing.
24/7 emergency inquiries
Call the confirmed number outside normal working hours.
End-to-end project support
Connect food protection with preparation and dining circulation.
Flexible rental terms
Compare extensions against actual assessed repair stages.
Heavy-duty commercial equipment
Identify cooking, washing, and cold-storage tasks separately.
Experienced logistics coordination
Verify receiving and servicing outside the work boundary.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
Why separate the eating area from production?
Its circulation, holding, and service tasks may differ from preparation and washing. Identify where prepared meals are received, held and handed to users, and where utensils go afterward. Assign those duties even if the main production room is located elsewhere.
What should be established before ceiling work?
The actual assessed boundary, food protection, access, responsibilities, and relevant specialist guidance. Show the usable rooms and the construction boundary on one plan. Ask how food, staff and clean utensils stay within the agreed operation throughout the work.
What costs should be compared separately?
Building protection and repairs, equipment, connections, servicing, extensions, and removal. Give our team the same service duties, dates and site information, then compare itemized inclusions and exclusions. A lower equipment line can leave connections, washing, storage or removal outside the proposed price.
What should be ready before the first meal?
Agree receiving, placement, utility work and the checks needed for the selected equipment, then identify who accepts each task. Include stock, staff and utensils in the changeover so the first service does not depend on unfinished setup.
Who operates the food service during the rental?
Name the food-service operator and the staff responsible for preparation, washing, storage and service. Keep those duties separate from equipment and site work, then ask our team to identify the support included in the rental proposal.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- FEMA historical declaration 4798
- USAspending historical award 47PH0518C0012
- Primary award data 47PH0518C0012
- Census county-equivalent identity
- University of Houston: Dining Commons, August 2026 project briefing
- Texas Division of Emergency Management: ESF 7 Logistics, January 2025, page 5
- Texas Division of Emergency Management: ESF 1 Transportation, January 2025, pages 5–6
- FDA: state food-safety resources






