Starting from $4,995 / month
22ft Low-Temperature Dish Trailer
A push-through washing station for a compact site.
View specifications and rental pricesRequest a quoteOpens inquiry formCommercial food-service equipment
Starting from $6,995 / month
Review the dirty-rack side, conveyor, clean-rack storage and supporting sinks as one sequence. The high-temperature model requires 220V, single-phase, 300A service. Its reference drawing helps the operations team discuss staffing and rack movement; confirm the actual machine and utility requirements in the quote. Include the operating dates, busiest return period, staff positions and available site services in your inquiry. We can then discuss the equipment and utility details that need to appear in the rental proposal.
Check against your operation
Confirm the assigned equipment, connection details, working clearances and included accessories with your quote. Match the menu, cookware and staff workflow with the actual configuration.
Follow dirty-rack storage through pre-rinse and the conveyor to clean storage. The reference includes three labeled hand sinks and water heaters; it omits the listed mop sink and does not state machine temperature.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $8,995 | $8,995 | $8,995 | $7,995 |
| Tier 2 | $7,995 | $7,995 | $7,995 | $6,995 |
| Tier 3 | $7,995 | $7,995 | $7,995 | $6,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Inspect the equipment references





Before agreeing a rental or lease
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
A conveyor workflow with an approved reference floor plan. Bring the washing return and rack movement, operating dates and site details together so the 38ft High-Temperature Conveyor Dish Trailer proposal fits the work that needs to move.
Review 38ft High-Temperature Conveyor Dish Trailer placement and site readiness early so access or connection work is visible before the delivery arrangement is agreed.
Reach our staffed phone 24/7 to discuss an urgent washing shutdown with the facility location and next service period ready.
Connect 38ft High-Temperature Conveyor Dish Trailer selection and setup with operating support, servicing and collection.
Compare every published duration band for the 38ft High-Temperature Conveyor Dish Trailer, then confirm the applicable customer tier, extensions and exact rental period.
Check the listed conveyor-type high-temperature dishwasher and 1 soil tray against the work your staff must perform.
Have the site team review 220V · Single phase · 300A alongside placement, receiving and the service route.
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Independent public examples
These public records show different operating constraints during an interruption. They are independent examples, rather than Water Damage Kitchen customer projects; use their specific lessons alongside the proposed equipment and your actual site.
For dishwashing, trace the return from service through washing to clean storage. Building work can affect that route and the available water, wastewater and electrical connections even when the cooking line remains open.
Miami-Dade County declared a flooding emergency effective June 12, 2024. For a kitchen in Miami, include storage placement and receiving in the site check. In Phoenix, September 2014 flooding made I-10 at 43rd Avenue impassable. These historical examples show why an equipment plan also needs a usable approach and current site information. County notice · NWS road account.
UCSF’s November 2026 update in San Francisco describes hospital structural work, utility cutovers and delivery-related traffic changes, with first patients expected in 2030. An occupied-site plan needs its food production, receiving and utility interfaces marked alongside the construction boundary. University construction update.
A December 2023 award at Birmingham VA covers main-kitchen renovation. For a comparable shutdown, identify which production stations and shared services close together before choosing the temporary cooking line; the building-work package and equipment rental need separate scopes. Public project record.
A September 2011 VA award in Chicago covered replacing the roof over a third-floor kitchen. Overhead work can require a temporary meal arrangement even when cooking appliances remain unchanged. Show the protected work boundary and food-transfer path before selecting equipment. Public project record.
A September 2018 Houston ceiling-replacement contract included dust containment and different finishes for kitchen and dining areas. A comparable plan should separate preparation, service and the construction boundary; moving appliances alone does not define the temporary meal route. Public project record.
The Southwest YMCA in Denver reports completed 2026 renovations with a teaching kitchen and food-pantry space. Its phased plan called for food distribution to continue. Separate teaching, ingredient storage and pantry receiving when defining which functions need temporary equipment during comparable work. Public project record.
Boston’s October 2026 schools address reports an improved central kitchen supporting scratch-cooked breakfast and lunch. A centralized meal plan needs production, packing, transport and serving points defined separately; replacement equipment at one address should fit its actual part in that system. Public project record.
Have the property mark the authorized receiving point, equipment position, staff routes and connection work. Confirm current road restrictions and the delivery arrangement for that address. A public emergency staging site does not establish permission to receive rental equipment there.
Use the full rental bands on this page, then confirm the applicable tier, dates, site work, servicing and collection in your written quote. Keep permanent repair costs separate so a change to building work does not hide an extension or another equipment move.
Kitchen project inquiries · 24/7
Describe what is returning from service, which sinks or machines are unavailable, and the water, power and drainage information you have. Include the next meal period and the working space beside the proposed equipment.
Project questions
Send the menu, busiest meal period, cooking methods, largest pans and staff workflow. For washing, include the peak return and rack movement; for refrigeration, include required product conditions and loading. We compare those requirements with the actual equipment list and available site services.
The starting figure is a rental comparison, not a complete project total. Delivery, collection, connections, setup, servicing, taxes and minimum terms are confirmed in the written quote. Tell us the facility location, dates and known access constraints so the proposal can identify each responsibility.
Yes. Our phone is staffed 24/7. Call with the facility city and state, the work that has stopped, the next meal period and the site information you have. We confirm the proposed equipment, availability and delivery arrangements for the actual project.
Include the expected period and any phased handovers in your inquiry. Confirm extension notice, revised rent, service visits, cleaning and collection in the agreement. Keep temporary equipment available until the permanent operation reaches its agreed handover and any required operating authorization is obtained.
Tell us about your kitchen
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.