At a glance
- Location
- Chicago, Illinois
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
1. Flooding and the property’s usable services
NWS identifies the west and southwest sides among the areas worst affected by July 2, 2023 flash flooding, with flooded homes and roads. For a current interruption, establish the property’s usable access, utilities and workstations. Historical rainfall cannot determine whether today’s loading space or kitchen connections are suitable.
2. Operating destinations need a complete meal brief
The new Obama Center currently lists Tafari’s Kitchen, a café and event catering. Those separate functions require different production and service questions. New casinos in Aurora and Rockford also combine eateries with other activities. For your own operation, specify simultaneous meal demands and staff routes rather than choosing equipment from visitor-building size.
3. Existing kitchens and phased replacement
Disciples Divinity House completed kitchen and dining ventilation work in March 2024, including induction ranges and a hood. A planned shared-kitchen conversion in Springfield differs from that completed changeover; Peoria’s Williams renovation reopened in September 2025. Identify your unavailable appliances, retained service and actual handover milestone.
4. Separate public logistics from private receiving
The September 2026 state distribution plan evaluates transport routes and delivery locations during the incident. Public resource assignments do not authorize a private rental movement. Check current restrictions, property permission, the accepted entrance, unloading position and receiver. Review any changed approach before the delivery arrangement is finalized.
5. Price the work through the first permanent meal
For a Tier 4 school inquiry, the $4,995 monthly starting price is an equipment reference rate for the 28ft kitchen in the 15 days–1 month or More than 3 Months bands. Delivery, setup and pickup are quoted for the Chicago project address. Send that address, the receiving entrance and rental dates so the proposal identifies equipment rent and site charges separately.
Use the 28ft Mobile Kitchen — Starting from $4,995 / month — Equipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4. as a configuration reference and request the complete proposed term. Naperville’s Block 59 distinguishes shell construction from later restaurant fit-out: make the same distinction when setting your own return date. Include transport, setup, connections, operating support, cleaning and collection, with separate washing or emergency refrigeration periods.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Chicago location reference
General geographic reference centered on the Census representative point for Chicago city. This map does not mark a company office.
- Geographic name
- Chicago city
- State
- Illinois (IL)
- Land area
- 227.75 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More Illinois kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
A Chicago project needs usable workstations and a receiving plan for its actual property. Our team connects those details with the proposed commercial configuration and terms.
Deployment coordination
Review the meal schedule and site constraints early for deployment planning.
24/7 emergency inquiries
Discuss urgent changes with the staffed 24/7 inquiry team.
End-to-end project support
Carry configuration and setup decisions through operating questions and return.
Flexible rental terms
Agree rental periods, extension notice and phased collection milestones.
Heavy-duty commercial equipment
Compare commercial equipment with the menu and utensil return.
Experienced logistics coordination
Identify the authorized receiver and usable access before dispatch arrangements.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
How do we describe an induction-line shutdown?
List the cooking tasks that stop, cookware, retained stations and available connections so the temporary configuration can be compared.
Can equipment support several service points?
Describe each point’s meal timing, staff movement and utensil return; review the arrangement against the proposed equipment and site.
What if only part of the kitchen closes?
Identify the retained work and utility boundaries, then request equipment for the functions that must move.
When should we arrange collection?
Agree permanent equipment acceptance, the first usable service and any stock transfer before confirming the rental handover.
Can we call outside office hours?
Our inquiry phone is staffed 24/7. Have the address, affected operation and next service period ready.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- National Weather Service: Chicago historical storm record
- Obama Foundation: visit the Center
- Obama Foundation: food and dining
- PENN Entertainment: third-quarter 2026 report, Aurora opening
- Hard Rock: permanent casino opening, September 2024 release
- Disciples Divinity House: Bon Appetit!, March 29, 2024
- City of Springfield: South Grand Avenue redevelopment agreement, August 2024
- Springfield Business Journal: An outdoor food court for Southtown, June 11, 2026
- 25News: Williams Dining Hall opening, September 11, 2025
- IEMA-OHS: Distribution Appendix, September 2026
- NCTV17: five restaurants planned at Block 59, October 1, 2026
- FDA: state food-safety resources






