At a glance
- Location
- Spokane, Washington
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
Past emergencies and the operating plan
FEMA’s DR-4593-WA includes Spokane County for the severe winter-storm and flooding incident during December 29, 2020–January 16, 2021. Check present receiving, utilities and the meal-delivery path independently of the room condition.
Construction scope before equipment selection
A December 6, 2018 main-kitchen renovation award at the Puget Sound healthcare system in Seattle supplies a statewide institutional example. Ask how permanent construction divides preparation, storage and washing duties before choosing a temporary configuration for the actual Spokane property and care menu.
Renovation and the meal-service sequence
A January 18, 2020 Seattle canteen-kitchen drain-repair award concerns a narrower system interruption. For a healthcare service, identify the actual meal and utensil-handling responsibilities that continue through each work phase.
Equipment access and placement
For healthcare service, retain actual patient-meal and utensil pathways beside the measured placement.
Compare the complete temporary-kitchen cost
Ask providers to price the same care menu, service periods and equipment term, with connections, washing or storage support, delivery, cleaning and removal explicit. Compare extensions against actual system and room handovers.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Spokane location reference
General geographic reference centered on the Census representative point for Spokane city. This map does not mark a company office.
- Geographic name
- Spokane city
- State
- Washington (WA)
- Land area
- 68.76 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More Washington kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
Healthcare meal service links diets, preparation and delivery. Keep those needs visible alongside the affected systems and temporary operating responsibilities.
Deployment coordination
Describe the care-meal pathway before configuration comparisons.
24/7 emergency inquiries
Explain the priority meal service through the confirmed 24/7 phone.
End-to-end project support
Coordinate permanent system work with temporary care operations.
Flexible rental terms
Compare rental periods against actual room and drain handovers.
Heavy-duty commercial equipment
Fit preparation, holding and washing to patient or resident needs.
Experienced logistics coordination
Confirm staff access, receiving and the full utensil-return path.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
What care information should come first?
Diets, meal times, holding, delivery and the tasks affected by permanent work. Describe actual diets, meal times, holding and delivery duties with the care operator. Show how food and utensils move between preparation and residents or patients, including responsibilities left with facility staff.
Can a drain repair need a different plan from renovation?
The actual system and meal-service restrictions determine the required arrangement. Separate tasks that can stay from those that must move, including washing and cold storage. The operator and responsible authority need to review the resulting arrangement rather than assume the whole room remains usable.
What should the provider confirm?
Configuration, connections, access, term and the support duties included in the proposal. Give our team the same service duties, dates and site information, then compare itemized inclusions and exclusions. A lower equipment line can leave connections, washing, storage or removal outside the proposed price.
Which healthcare meals take priority?
The care operator should identify diets and meal periods that need the earliest coverage, with preparation, holding and delivery times. Keep those duties beside the actual repair restrictions when our team reviews the configuration and service start.
Who confirms receiving at the facility?
The property supplies authorized access and acceptance conditions. Identify the entrance, authorized receiver and delivery window, then show how supplies reach preparation. Ask our team to confirm vehicle and unloading needs before either party schedules arrival.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- Treasury award record: VISN 20 CONSTRUCTION IDIQ MATOC TASK ORDER UNDER 36C26018D0007 FOR TO RENOVATE THE MAIN KITCHEN AT P
- Treasury award record: ***EMERGENCY*** CANTEEN KITCHEN DRAIN REPAIR - SEATTLE VAMC
- FEMA historical county designation and incident dates
- FDA Food Code: model provisions; local adoption and authority must be checked
- FDA: state food-safety resources






