At a glance
- Location
- San Diego, California
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
1. Past emergencies and the operating plan
The city documented widespread flooding on January 22, 2024, including a closed Central Library garage. For a current interruption, establish usable access and connections. Los Angeles’s rain-undermined Mulholland roadway shows why a kitchen assessment alone cannot establish the equipment approach.
2. New construction and first service
The airport’s September 11, 2026 update says new Terminal 1 Phase 1B is underway, adding gates and dining with a 2028 target. San Francisco’s new hospital separates construction completion from clinical activation. Set your temporary production period against the actual concession or meal-service handover.
3. Renovation and alternate production
The city’s September 2026 notice proposes improvements to the existing Fire Station 51 temporary facility, including its small kitchen’s plumbing, hood and finishes. It establishes neither expansion nor completion. For comparable work, identify whether cooking, washing or the entire room becomes unavailable before selecting replacement equipment.
4. Incident access and equipment receiving
Cal OES uses an incident-specific site and traffic plan, shipment check-in and documented receiving. Obtain the assigned public destination and current gate instructions. A rental at a terminal, campus or other controlled property separately needs the operator’s authorized receiver and placement approval.
5. Equipment rates and the complete quote
The 28ft Mobile Kitchen — Starting from $4,995 / month — Equipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4. provides a published equipment reference. Include transport, site connections, washing, emergency refrigerated storage and collection in the complete quote. Review extensions against accepted permanent operation rather than a general construction target.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
San Diego location reference
General geographic reference centered on the Census representative point for San Diego city. This map does not mark a company office.
- Geographic name
- San Diego city
- State
- California (CA)
- Land area
- 326.03 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More California kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
Phased service needs a clear boundary between construction and the meals still being served. Our San Diego rental review aligns the equipment period with that operating handover.
Deployment coordination
Coordinate placement before the first required service.
24/7 emergency inquiries
Reach our staffed 24/7 number for an interruption.
End-to-end project support
Review equipment selection, setup, operation and return around permanent acceptance.
Flexible rental terms
Review extensions for delayed concession or kitchen handovers.
Heavy-duty commercial equipment
Match commercial equipment to the temporary menu.
Experienced logistics coordination
Assign controlled receiving and utility connection duties.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
Does a finished kitchen establish meal readiness?
No. San Jose’s January 2026 Camden minutes reported a completed remodel but a future cooking start. Confirm staffing, connections and operator acceptance.
Can an appliance change alter site requirements?
Yes. Oakland’s senior-center renovation electrified its kitchen. Check the actual proposed equipment and electrical service rather than carry forward old connection assumptions.
How should emergency vehicle access be handled?
Protect it in the site plan. Sacramento’s hospital construction explicitly coordinates truck movements around ambulance traffic; obtain the actual property’s current instructions.
What determines dishwashing requirements?
Use the busiest utensil-return period and the dirty-to-clean route. Confirm water, wastewater, clean storage and the path back to service.
Can refrigeration have a separate end date?
Review a separate term when permanent cold storage returns later. Assign stock transfer and monitoring until the permanent space is ready.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- City of San Diego: January 22, 2024 flooding and facility impacts
- LADOT: February 2024 Mulholland damage and May reopening, May 30, 2024
- San Diego Airport Authority: active Terminal 1 Phase 1B, September 11, 2026
- UCSF: new Helen Diller Hospital construction and access, November 12, 2026
- City of San Diego: proposed existing Fire Station 51 kitchen improvements, September 22, 2026
- Cal OES: Logistics Staging Area SOP, January 2024, site plans and shipment receiving
- City of San José: Camden kitchen remodel and proposed meal start, January 8, 2026 minutes, page 4
- City of Oakland: reopened West Oakland Senior Center and kitchen electrification, October 21, 2026
- UC Davis Health: active California Tower construction notices, checked November 25, 2026
- FDA: state food-safety resources






