At a glance
- Location
- Los Angeles, California
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
1. Past emergencies and the operating plan
LADOT’s May 2024 account records February rain undermining Mulholland Drive and closing it between Bowmont and Skyline. San Diego’s January storm also flooded a library garage. For a present move, check the approach and unloading position as well as the kitchen’s condition.
2. New construction and first service
USC opened its new Bloom Performance Center on August 5, 2026, including nutrition space and a terrace kitchen area. San Jose’s Campus Village 3 dining hall remains a plan. Tie any interim cooking period to the actual operating handover, not the announcement of a building.
3. Renovation and alternate production
Junior League of Los Angeles reports the Watts Senior Center kitchen renovation completed in 2026. Oakland’s reopened senior center specifically electrified its commercial kitchen. Identify which connections change during your own remodel before assuming the replacement appliances can use existing services.
4. Incident access and equipment receiving
Cal OES’s 2024 staging SOP requires incident-specific site plans, shipment check-in and an authorized delivery handoff. Obtain current instructions for an assigned public response site. For a private rental, separately confirm the property receiver, vehicle entrance and protected route to each meal destination.
5. Equipment rates and the complete quote
Review the 28ft Mobile Kitchen — Starting from $4,995 / month — Equipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4. equipment rate beside the work needed at every location. Quote transport, connections, washing, emergency refrigeration and collection separately; agree who moves food between sites and how an extended repair changes the rental period.
For equipment at more than one Los Angeles location, list every project address, receiving entrance and rental period. Request separate delivery, setup and collection line items for each location. Identify any planned transfer between sites and ask the quote to confirm the cost of moving, disconnecting and setting up again. Confirm how different start dates, extensions and collection dates affect each location’s rental and service charges.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Los Angeles location reference
General geographic reference centered on the Census representative point for Los Angeles city. This map does not mark a company office.
- Geographic name
- Los Angeles city
- State
- California (CA)
- Land area
- 470.52 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More California kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
A multi-site kitchen change needs one production plan and clear handoffs at every destination. Our rental review connects equipment choices with the people responsible for each stage.
Deployment coordination
Coordinate placement around the first required meal.
24/7 emergency inquiries
Discuss lost cooking through our staffed 24/7 number.
End-to-end project support
Coordinate selection, setup and temporary production through each permanent-kitchen handover and rental collection.
Flexible rental terms
Review staggered rental periods and extension notice.
Heavy-duty commercial equipment
Match commercial workstations to the production menu.
Experienced logistics coordination
Assign receiving, utilities and inter-site food movement.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
Can one rental support several meal destinations?
Review the production menu, dispatch windows and each receiving point. Name the operator responsible for food transport and holding before choosing equipment.
Do major projects share one delivery plan?
No. Hospital construction in Sacramento and San Francisco publishes its own traffic controls. Obtain current instructions for the actual property and delivery.
Should washing move with cooking?
Move it if the permanent washing system or safe utensil route is unavailable. Review dirty receiving, water, wastewater and clean storage separately.
When should the temporary kitchen leave?
After the operator accepts permanent production and completes the staff, stock and utensil transfer. Agree collection and extension notice in advance.
What should the first inquiry include?
Send each affected address, menu, meal windows, unavailable functions and work dates. Include known connection limitations and the receiving contact.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- LADOT: February 2024 Mulholland damage and May reopening, May 30, 2024
- City of San Diego: January 22, 2024 flooding and facility impacts
- USC: new Bloom Performance Center opening, August 5, 2026, reported August 6
- San José State University: planned new Campus Village 3 dining hall, updated May 6, 2026
- Junior League of Los Angeles: completed Watts Senior Center kitchen, 2026 project account
- City of Oakland: reopened West Oakland Senior Center and kitchen electrification, October 21, 2026
- Cal OES: Logistics Staging Area SOP, January 2024, site plans and shipment receiving
- UC Davis Health: active California Tower construction notices, checked November 25, 2026
- UCSF: new Helen Diller Hospital construction and access, November 12, 2026
- FDA: state food-safety resources






