At a glance
- Location
- Salt Lake City, Utah
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
Past emergencies and the operating plan
Salt Lake County is designated in FEMA’s DR-4578-UT for straight-line winds during September 7–8, 2020. The campus needs its own assessment for a present interruption. Check the actual food receiving, utility connections and path to service separately from the broader county history.
Construction scope before equipment selection
A September 19, 2017 local award combines roof replacement and kitchen rehabilitation at the childcare facility associated with the Air Route Traffic Control Center. This existing-facility scope highlights overhead-work and kitchen interfaces.
Renovation and the meal-service sequence
A September 29, 2011 childcare-kitchen remodel in Ogden offers a separate institutional comparison.
Equipment access and placement
The campus also needs its own preparation-to-dining pathway and measured temporary placement.
Compare the complete temporary-kitchen cost
Compare the same campus service program and equipment duration. Historical roof-and-kitchen obligations are not current local rental prices; written proposals should identify provider duties and what remains with the campus operator.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Salt Lake City location reference
General geographic reference centered on the Census representative point for Salt Lake City city. This map does not mark a company office.
- Geographic name
- Salt Lake City city
- State
- Utah (UT)
- Land area
- 110.89 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More Utah kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
Campus meal pathways depend on receiving and building interfaces. Describe those connections alongside the permanent work before comparing temporary kitchen configurations.
Deployment coordination
Map campus food-service duties before selecting configurations.
24/7 emergency inquiries
Describe the affected operation through the confirmed 24/7 contact.
End-to-end project support
Coordinate overhead work, access and temporary meal service.
Flexible rental terms
Compare lease periods against separate roof and room handovers.
Heavy-duty commercial equipment
Match equipment to the actual production and distribution pattern.
Experienced logistics coordination
Confirm receiving and controlled access for the proposed placement.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
Why include roof work in the kitchen brief?
It can affect isolation, access and systems the food service depends on. Ask the project team how the food operation is separated from overhead work, including access and systems affected. A nearby room should not be treated as usable simply because its appliances are untouched.
What should a campus map distinguish?
Receiving, preparation, distribution, staff movement and the final service point. Trace receiving, preparation, cooking, holding, service and used-utensil return. Mark any handoff between rooms so our team can identify equipment and support work that the footprint alone misses.
How should separate washing be handled?
State who supplies and operates it and include its cost in the comparison. List the utensils generated at each meal and the route from dirty return to washing and clean storage. State whether this is included in the proposed kitchen or provided separately.
Which campus routes need separation?
Show supplies, staff, food and contractor movement. Identify where prepared meals are received, held and handed to users, and where utensils go afterward. Assign those duties even if the main production room is located elsewhere.
Who confirms controlled access?
Obtain current authorization for the actual receiving destination. Confirm who authorizes arrival, which entrance and receiver to use, and any vehicle or service-visit conditions. Our team needs these instructions for the actual configuration, not a general public entrance.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- Treasury award record: ROOF REPLACEMENT AND KITCHEN REHABILITATION AT THE CHILDCARE FACILITY ONSITE AT THE SALT LAKE CITY A
- Treasury award record: OGDEN, UT, IRS SERVICE CENTER CHILDCARE FACILITY KITCHEN REMODEL PROJECT.
- FEMA historical county designation and incident dates
- FDA Food Code: model provisions; local adoption and authority must be checked
- FDA: state food-safety resources






