At a glance
- Location
- Provo, Utah
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
Past emergencies and the operating plan
Utah County is included in FEMA’s DR-4752-UT for flooding during May 1–27, 2023. Check each program address separately for usable rooms, receiving, power, water and food movement rather than assigning one county incident condition to every kitchen.
Construction scope before equipment selection
A September 29, 2011 childcare-kitchen remodel award in Ogden is an existing-room project. Its practical construction question is which preparation and washing duties lose access during the work. Obtain the current property’s sequence before assuming the same temporary configuration will serve every site.
Renovation and the meal-service sequence
The September 19, 2017 roof-and-kitchen rehabilitation at a childcare facility in Salt Lake City illustrates combined overhead and room work. Agree on equipment removal, temporary service and permanent commissioning as distinct handover points at each address.
Equipment access and placement
Before any actual program move, confirm the receiver, placement, staff entrance and meal-service handoff at that address.
Compare the complete temporary-kitchen cost
Ask which charges repeat when equipment moves between sites. Historical childcare renovations do not establish local rental prices; written proposals should show equal service duties and the cost conditions for a delayed permanent handover.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Provo location reference
General geographic reference centered on the Census representative point for Provo city. This map does not mark a company office.
- Geographic name
- Provo city
- State
- Utah (UT)
- Land area
- 41.89 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More Utah kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
Separate program addresses need separate menus and work boundaries. Coordinate equipment only after the actual operating differences and receiving duties are visible.
Deployment coordination
Prepare a deployment brief for each affected program address.
24/7 emergency inquiries
Identify the priority kitchen through the confirmed 24/7 contact.
End-to-end project support
Coordinate shared tasks while preserving each site’s restrictions.
Flexible rental terms
Compare move and extension terms against separate handovers.
Heavy-duty commercial equipment
Match configurations to each menu and usable connection set.
Experienced logistics coordination
Confirm a receiver and service route for every placement.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
What may differ between program sites?
Menu, hours, receiving, usable connections and the permanent-work sequence. Use a separate site sheet for each address, with equipment periods, connections, receiving and support duties. Compare genuinely shared work separately so one property’s assumptions do not hide another’s costs.
How should move costs be compared?
Show delivery, setup, cleaning and removal at every planned placement. List every planned placement and collection, including connections, cleaning and any repeat setup. Ask which charges recur and how the term changes between locations instead of assuming a single move price.
Can one site’s approval transfer automatically?
The actual operation and responsible authority need checking for each property. Describe the actual address, menu, equipment and temporary location when seeking review. Ask which decisions belong to the food, fire or building authority and which remain with the operator.
How should extra equipment moves be priced?
List the planned placements and collections in order, with setup, connections and cleaning under each address. Ask which charges repeat and how an altered permanent-work sequence changes the rental period and responsibilities.
Who accepts equipment at each move?
Name the authorized receiver for each placement and identify who accepts the equipment and connection work. Give our team current access instructions for that address before relying on a shared program arrival schedule.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- Treasury award record: OGDEN, UT, IRS SERVICE CENTER CHILDCARE FACILITY KITCHEN REMODEL PROJECT.
- Treasury award record: ROOF REPLACEMENT AND KITCHEN REHABILITATION AT THE CHILDCARE FACILITY ONSITE AT THE SALT LAKE CITY A
- FEMA historical county designation and incident dates
- FDA Food Code: model provisions; local adoption and authority must be checked
- FDA: state food-safety resources






