At a glance
- Location
- Montgomery, Alabama
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
1. A separate operating priority for every site
FEMA’s DR-1971-AL includes Montgomery County for the April–May 2011 storms and flooding. DOE’s May 3 report also documents continuing power restoration in Huntsville after that outbreak. At each present project, identify usable connections and the first uncovered meal separately; a shared storm does not make one temporary configuration suitable everywhere.
2. New construction and food-service readiness
Project architect Robert A.M. Stern lists the new Alabama State House as under construction, with legislative chambers and offices in its program. Set your own food-service milestone separately: identify the first meal, permanent equipment and connections needed before ending temporary production. Construction status alone does not confirm operating readiness.
3. Floor work can interrupt washing and wastewater
The Sheriff’s Spring 2024 newsletter describes detention-kitchen floor demolition to replace underground plumbing, before a new floor pour. Identify washing and wastewater with cooking. UA’s planned Lakeside work in Tuscaloosa separately includes cold/dry storage and allergen preparation: define the actual displaced functions before assigning one configuration across your program.
4. Incident-specific receiving and access
Maxwell Air Force Base served as a September 2024 Helene Incident Support Base. Alabama’s plan provides for incident-assigned staging or specified delivery points in WebEOC and reassessment of transport routes. Obtain the receiving address, authorized contact and current approach for every placement. Staging does not itself grant entry or designate an equipment destination.
5. Quote the moves and staggered returns
Quote each property’s term, connections and collection. Mobile’s airport authority announced November 2026 approach closures expected through March 2027; recheck receiving at the next destination before relying on a future move. Identify repeated setup and delayed-handover charges.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Montgomery location reference
General geographic reference centered on the Census representative point for Montgomery city. This map does not mark a company office.
- Geographic name
- Montgomery city
- State
- Alabama (AL)
- Land area
- 159.85 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More Alabama kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
A Montgomery multi-site rental joins individual operating briefs to a shared work schedule. Agree these six responsibilities while preserving each property’s connections and receiving conditions.
Deployment coordination
Coordinate deployment around the priority site’s first meal.
24/7 emergency inquiries
Discuss changed priorities through our staffed 24/7 line.
End-to-end project support
Coordinate selection, setup, temporary service and return as permanent cooking resumes.
Flexible rental terms
Review terms for staggered returns and repeat moves.
Heavy-duty commercial equipment
Match commercial configurations to each site’s meal duties.
Experienced logistics coordination
Assign a receiver and connection responsibilities at every address.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
Should every site use the same configuration?
Only when actual duties and sites match. The Birmingham contractor kept temporary cooking until permanent acceptance; Dothan’s contractor chose an exterior kitchen over an internal conversion. Establish each property’s position and return sequence.
How should the program set priorities?
Identify the first uncovered meal and owner milestones at each address. Give that site its own menu, connection and receiving information before arranging the next placement.
How should program costs be compared?
Compare each equipment period, setup, connections and collection separately. Identify shared duties and the extra charges if a handover or move changes.
Who receives equipment at each site?
Name an authorized receiver and provide current entry instructions for every placement. Agree who accepts the equipment and connection work before confirming the handoff.
Should extra moves be priced?
Yes. List each placement and collection, including repeated connections and cleaning. Ask which charges recur and how the equipment term runs between locations.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- U.S. Department of Energy: power restoration report, May 3, 2011
- Project architect: new Alabama State House listed under construction
- Montgomery County Sheriff Quarterly: kitchen plumbing work, Spring 2024, page 6
- University of Alabama: Lakeside kitchen, storage and preparation renovation plan
- Air University Public Affairs: Maxwell staging for Hurricane Helene, September 2024
- Alabama Emergency Operations Plan: incident logistics and transport, as of May 21, 2025
- Mobile Airport Authority: terminal approach closures, October 23, 2026
- Project contractor: Birmingham VA temporary kitchen and phased changeover
- Project contractor: Southeast Health temporary kitchen and renovation, November 3, 2020
- FEMA historical county designation and incident dates
- FDA: state food-safety resources






