At a glance
- Location
- Mobile, Alabama
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
1. Storm access and available connections
Katrina’s August 2005 surge flooded downtown Mobile and closed the Wallace Tunnel, according to NWS. Inland utility interruption is a different constraint: DOE still reported partial power restoration in Huntsville on May 3 after the April 2011 storms. For today’s operation, verify both the receiving approach and usable connections.
2. New terminal work changes the approach
Mobile Airport Authority’s October 23, 2026 notice announced the Michigan Avenue/Broad Street intersection closure from November 2 through an expected March 22, 2027, ahead of the new terminal’s anticipated spring opening. Businesses east of Michigan Avenue were directed via I-10’s Duval or Broad Street exits. Confirm current owner-approved access for an affected project; schedules can change.
3. Dining renovation and alternate meal service
South Alabama’s April 2025 memorandum planned summer food-court and Marx Library Starbucks renovations, finishing before August classes. Identify the outlets and production duties your own work displaces. Documented hospital changeovers in Birmingham and Dothan used temporary kitchens; their positions, connections and return milestones should not be assumed for a retail outlet.
4. Incident-specific receiving and access
Maxwell Air Force Base in Montgomery served as a September 2024 Helene Incident Support Base. Alabama’s plan assigns staging or specified delivery points through WebEOC and requires transport reassessment. Give our team the address and receiver assigned to your operation, with current entry instructions; a public coordination office is not automatically the destination.
5. Price the displaced production duties
Choose the equipment configuration around displaced production. Price cooking, washing, cold storage, transport, connections, support and collection as required. A cooler-only interruption may need a separate refrigeration term; agree extension and phased-return charges before accepting the arrangement.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Mobile location reference
General geographic reference centered on the Census representative point for Mobile city. This map does not mark a company office.
- Geographic name
- Mobile city
- State
- Alabama (AL)
- Land area
- 150.84 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More Alabama kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
A Mobile production changeover joins receiving, cooking and dispatch to the actual work boundary. Agree these six responsibilities before the permanent arrangement becomes unavailable.
Deployment coordination
Coordinate placement with the first required production period.
24/7 emergency inquiries
Describe interrupted functions through our staffed 24/7 number.
End-to-end project support
Connect selection, setup and temporary operation with permanent restart and collection.
Flexible rental terms
Review separate terms and changed collection dates.
Heavy-duty commercial equipment
Match commercial equipment to production and washing duties.
Experienced logistics coordination
Assign incoming stock, outgoing meals and utensil-return paths.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
What should a production inquiry identify?
List unavailable receiving, cooking, washing, storage or dispatch duties. Show how the remaining stages depend on them, with the menu, production period and actual site constraints.
Can refrigeration run for a different period?
Discuss separate dates and collection. UA’s planned Lakeside work in Tuscaloosa includes cold/dry storage; identify your displaced stock duties before choosing cooking equipment.
What should the production quote include?
Itemize the configuration, equipment period, transport, connections, support and collection. Identify separate washing and storage needs and how an extension changes the charges.
What belongs in dispatch planning?
Show outgoing meals separately from incoming stock and used-utensil return. Give each a receiving point, operating window and responsible contact before agreeing the temporary position.
How can washing avoid interrupting production?
Show the dirty-to-clean utensil cycle and its connections. Review separate dishwashing equipment when permanent washing stops, including staffing and clean-storage duties.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- National Weather Service: Hurricane Katrina, August 2005
- U.S. Department of Energy: power restoration report, May 3, 2011
- Mobile Airport Authority: terminal approach closures, October 23, 2026
- University of South Alabama: dining renovation memorandum, April 11, 2025, page 54
- Project contractor: Birmingham VA temporary kitchen and phased changeover
- Project contractor: Southeast Health temporary kitchen and renovation, November 3, 2020
- Air University Public Affairs: Maxwell staging for Hurricane Helene, September 2024
- Alabama Emergency Operations Plan: incident logistics and transport, as of May 21, 2025
- University of Alabama: Lakeside kitchen, storage and preparation renovation plan
- FDA: state food-safety resources






