At a glance
- Location
- Saint Louis, Missouri
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
Past emergencies and the operating plan
FEMA designates St. Louis city in DR-4877-MO for severe storms, straight-line winds, tornadoes and flooding on May 16, 2025. Keep the independent city’s record distinct from surrounding county geography.
Construction scope before equipment selection
The July 29, 2009 local cafeteria-upgrade award describes a new dish room, servery changes, kitchen-equipment replacement and phased work to minimize disruption. Ask the actual project team how temporary cooking, washing and distribution fit beside the permanent work zone.
Renovation and the meal-service sequence
A November 25, 2008 award describes renovation of a daycare kitchen and storage area at the Goodfellow federal complex.
Equipment access and placement
Confirm the actual visitor property's receiver, unit access and separation of clean storage from used utensils.
Compare the complete temporary-kitchen cost
Compare the same menu, service hours, equipment term and supporting duties. Public cafeteria and daycare-renovation obligations are not current local rental rates; written proposals should show included work and the remaining operator responsibilities.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Saint Louis location reference
General geographic reference centered on the Census representative point for St. Louis city. This map does not mark a company office.
- Geographic name
- St. Louis city
- State
- Missouri (MO)
- Land area
- 61.72 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More Missouri kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
Kitchen production, dish handling and service are connected tasks. A coordinated brief makes their interfaces with construction and site access easier to compare.
Deployment coordination
Define the production-to-service pathway before selecting configurations.
24/7 emergency inquiries
Describe the interrupted operation through the confirmed 24/7 line.
End-to-end project support
Coordinate servery, washing and construction responsibilities.
Flexible rental terms
Compare rental periods against verified permanent-work milestones.
Heavy-duty commercial equipment
Match cooking and storage to the actual visitor or institutional menu.
Experienced logistics coordination
Confirm receiving and separate clean and used-utensil movement.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
How should a cafeteria plan connect washing with service?
Map used-utensil return, washing and clean storage alongside preparation and the service line. Ask which functions move during each work phase and assign the food and utensil handoffs so a cooking-only proposal does not leave the dining operation incomplete.
What should the site address identify before delivery planning?
Give our team the physical facility, receiving entrance and authorized contact, together with current entry conditions. Use the actual property when discussing approvals and placement; regional emergency records do not identify a supplier destination or settle site-specific access.
What should the provider price?
The actual service, configuration, term, connections and agreed supporting work. Give our team the same service duties, dates and site information, then compare itemized inclusions and exclusions. A lower equipment line can leave connections, washing, storage or removal outside the proposed price.
What should dish handling identify?
Dirty return, washing and clean storage. List the utensils generated at each meal and the route from dirty return to washing and clean storage. State whether this is included in the proposed kitchen or provided separately.
Who confirms the actual work boundary?
Obtain it from the permanent project team. Show the usable rooms and the construction boundary on one plan. Ask how food, staff and clean utensils stay within the agreed operation throughout the work.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- Treasury award record: RECOVERY TAS::47 4543::TAS RAY ARRA CAFETERIA UPGRADE - THE CMC WILL PROVIDE PRECONSTRUCTION SERVICE
- Treasury award record: RENOVATION OF DAY CARE KITCHEN/STORAGE AREA AT THE FEDERAL CENTER COMPLEX, 4300 GOODFELLOW BLVD., ST
- Treasury award record: IGF::OT::IGF RELOCATE CANTEEN&KITCHEN 589A4-13-120; RELOCATE CARDIOLOGY 589A4-12-102; RELOCATE AUDIO
- FEMA historical county designation and incident dates
- FDA Food Code: model provisions; local adoption and authority must be checked
- FDA: state food-safety resources






