At a glance
- Location
- Sioux Falls, South Dakota
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
Past emergencies and the operating plan
Minnehaha County is designated in FEMA’s DR-4807-SD for severe storms, straight-line winds and flooding during June 16–July 8, 2024. Check each location’s receiving, food-service systems and staff access rather than treating county history as one condition report for all kitchens.
Construction scope before equipment selection
A September 7, 2017 Sioux Falls VA award concerns lead abatement for kitchen hoods. Ask the actual project team which systems and spaces become unavailable before selecting how temporary preparation and washing continue.
Renovation and the meal-service sequence
A March 26, 2012 Sioux Falls award describes kitchen-ceiling renovations, a separate historical scope.
Equipment access and placement
Each actual program address requires its own receiver, connections and food-service pathway before coordinating equipment moves.
Compare the complete temporary-kitchen cost
Compare costs by address and identify tasks genuinely shared across the program. Historical abatement or ceiling obligations are not local rental prices; written proposals should explain who bears extra moves or a delayed permanent handover.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Sioux Falls location reference
General geographic reference centered on the Census representative point for Sioux Falls city. This map does not mark a company office.
- Geographic name
- Sioux Falls city
- State
- South Dakota (SD)
- Land area
- 84.55 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More South Dakota kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
A multi-site meal program needs clear work zones at every address. Coordinate equipment terms with the actual operating duties and individual handovers.
Deployment coordination
Prepare deployment details separately for each affected location.
24/7 emergency inquiries
Identify the priority kitchen through the confirmed 24/7 contact.
End-to-end project support
Coordinate overhead work with meal-service and isolation responsibilities.
Flexible rental terms
Compare terms and additional moves against individual handovers.
Heavy-duty commercial equipment
Match cooking and washing to each site’s actual meal program.
Experienced logistics coordination
Confirm receivers and any intersite food or utensil movement.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
Why identify overhead work before equipment?
It may change usable rooms, system access and the isolation required for food service. Ask the contractor to show equipment moves, work boundaries and the point when the area is released. Plan the temporary service around that sequence, including any changed access.
Which program costs should be separated?
Each address’s equipment period, delivery, setup, cleaning and removal. Use a separate site sheet for each address, with equipment periods, connections, receiving and support duties. Compare genuinely shared work separately so one property’s assumptions do not hide another’s costs.
Can similar work imply the same operation?
No. Have each operator confirm its actual menu, service periods, connections and work restrictions. Keep those facts under the relevant address before applying a shared configuration, support scope or rental schedule across the program.
What should each work zone identify?
Its affected systems and continuing meal duties. Show the usable rooms and the construction boundary on one plan. Ask how food, staff and clean utensils stay within the agreed operation throughout the work.
Should extra moves be discussed?
Compare their setup and removal responsibilities explicitly. Ask what cleaning, disconnection, collection and site reinstatement the price includes. Confirm notice periods and access for the return vehicle so the end of use does not leave unassigned work.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- Treasury award record: IGF::OT::IGF TASK ORDER OFF VISN 23 CONSTRUCTION MATOC IDIQ - LEAD ABATEMENT FOR KITCHEN HOODS PROJE
- Treasury award record: NRM PROJECT: KITCHEN CEILING RENOVATIONS
- Treasury award record: IGF::CL::IGF FIRM FIXED-PRICE, TASK ORDER HHSI24103047T ISSUED AGAINST CONTRACT HHSI241201000017I FO
- Treasury award record: MORATORIUM EXCEPTION: EMERGENCY - IMMINENT THREAT TO HEALTH, PROPERTY - BOXELDER KITCHEN/DINING HVAC
- FEMA historical county designation and incident dates
- FDA Food Code: model provisions; local adoption and authority must be checked
- FDA: state food-safety resources