At a glance
- Location
- Shreveport, Louisiana
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
Past emergencies and the operating plan
FEMA includes Caddo Parish in DR-4611-LA for Hurricane Ida during August 26–September 3, 2021. Check whether the present interruption affects preparation, receiving, dispatch or usable utilities, with the operator’s decisions retained for the property.
Construction scope before equipment selection
A September 29, 2017 Shreveport award describes replacement of a main-kitchen air-handling unit at the VA facility. Obtain the actual work boundary before deciding which preparation or washing functions a temporary arrangement must cover.
Renovation and the meal-service sequence
A July 18, 2019 local award concerns replacement of a canteen-kitchen drain.
Equipment access and placement
Obtain the actual Shreveport receiving and connection arrangements rather than assuming food or equipment can transfer.
Compare the complete temporary-kitchen cost
Compare the same production schedule, equipment period and supporting duties across providers. Identify temporary utilities, storage or washing support, delivery, cleaning, removal and extensions. Historical HVAC and drain obligations do not establish local rental rates; written proposals should show what is included and what the operator must arrange separately.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Shreveport location reference
General geographic reference centered on the Census representative point for Shreveport city. This map does not mark a company office.
- Geographic name
- Shreveport city
- State
- Louisiana (LA)
- Land area
- 108.17 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More Louisiana kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
Production service depends on ventilation, drains and food movement together. Keep each stage visible when comparing equipment options and permanent-system work.
Deployment coordination
Describe production stages and affected systems before deployment discussions.
24/7 emergency inquiries
Use the confirmed 24/7 phone to explain the interrupted process.
End-to-end project support
Coordinate ventilation, drainage and temporary production responsibilities.
Flexible rental terms
Compare terms against the actual permanent-system return.
Heavy-duty commercial equipment
Fit cooking, storage and washing to the production menu.
Experienced logistics coordination
Separate receiving, dispatch and used-utensil movement on the site plan.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
Can drain work affect more than washing?
Identify the actual preparation and sanitation functions that depend on the affected system. List the work outside the equipment itself and assign each task to our team, property or another specialist. Ask for unresolved responsibilities to be settled before accepting the proposal.
What is needed beyond appliance capacity?
Usable connections, storage, staff access and a complete food and utensil pathway. Equipment arrival is one milestone. Placement, utility work, agreed checks and an operator handover must also be scheduled so the first meal does not depend on unfinished supporting work.
How are production proposals compared fairly?
Use the same menu stages, hours, term and support responsibilities. Give our team the same service duties, dates and site information, then compare itemized inclusions and exclusions. A lower equipment line can leave connections, washing, storage or removal outside the proposed price.
Which production movements must be separated?
Receiving, dispatch and used-utensil return. Show incoming stock, outgoing meals and used-utensil return as different flows. Give each a receiving or dispatch point, operating window and responsible contact before settling the temporary position.
Who manages temporary washing?
Name its operator and connection to the production process. List the utensils generated at each meal and the route from dirty return to washing and clean storage. State whether this is included in the proposed kitchen or provided separately.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- Treasury award record: IGF::OT::IGF PROJECT NO. 667-16-102 REPLACE MAIN KITCHEN AIR HANDLING UNIT (AHU), BLDG 1, OBVAMC, SH
- Treasury award record: REPLACE CANTEEN KITCHEN DRAIN
- FEMA historical county designation and incident dates
- FDA Food Code: model provisions; local adoption and authority must be checked
- FDA: state food-safety resources






