At a glance
- Location
- Saint Paul, Minnesota
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
Past emergencies and the operating plan
FEMA’s DR-4442-MN includes Ramsey County for severe winter storm, straight-line winds and flooding during March 12–April 28, 2019. Check receiving, guest circulation and utilities independently of the condition of the permanent preparation room.
Construction scope before equipment selection
A February 26, 2026 St. Cloud award describes repair of a basement kitchen in Building 50. For the actual Saint Paul hotel, obtain the permanent team’s sequence before selecting how temporary preparation, washing and storage will cover the interruption.
Renovation and the meal-service sequence
The September 22, 2014 kitchen-and-countertop installation at Tamarac National Wildlife Refuge in Rochert is a separate institutional example.
Equipment access and placement
At the hotel, distinguish guests, contractors, supplies and the actual route to dining.
Compare the complete temporary-kitchen cost
Compare the same meal program and equipment duration across providers. Historical repair and installation obligations are not current hotel rental prices; written proposals should show the complete duties and remaining hotel responsibilities.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Saint Paul location reference
General geographic reference centered on the Census representative point for St. Paul city. This map does not mark a company office.
- Geographic name
- St. Paul city
- State
- Minnesota (MN)
- Land area
- 51.98 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More Minnesota kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
Hotel services have different preparation windows and circulation needs. Keep those distinctions visible when comparing equipment, support work and permanent repair handovers.
Deployment coordination
Prioritize the hotel meal services before configuration decisions.
24/7 emergency inquiries
Describe the interrupted operation on the confirmed 24/7 line.
End-to-end project support
Coordinate guest service with permanent and temporary kitchen work.
Flexible rental terms
Compare terms against uncertain room and system handovers.
Heavy-duty commercial equipment
Match cooking, storage and washing to the actual hotel menu.
Experienced logistics coordination
Separate guests, contractors and supplier receiving on the site plan.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
Should all hotel meal services be treated alike?
Record their different preparation windows, storage and service movements. Separate breakfast, restaurant, banquet and staff meals by preparation and service window. Note shared washing and storage, and ask which service takes priority if the temporary arrangement cannot support every outlet together.
What makes a placement operationally useful?
Confirmed connections and a workable path for supplies, staff, food and utensils. Equipment arrival is one milestone. Placement, utility work, agreed checks and an operator handover must also be scheduled so the first meal does not depend on unfinished supporting work.
What should extensions be compared against?
The actual permanent repair and commissioning sequence, with included support duties unchanged. Ask for the notice needed to extend or end use, any change in rate, continued servicing and collection arrangements. Keep unresolved permanent-work milestones visible beside those terms.
What happens if one hotel service resumes before the others?
Identify which cooking, washing and storage duties still need temporary coverage, then ask our team how the configuration and term can change. Keep removal and extension conditions alongside the remaining service windows before releasing equipment.
Who confirms the loading point?
The property and provider must agree receiving access. Identify the entrance, authorized receiver and delivery window, then show how supplies reach preparation. Ask our team to confirm vehicle and unloading needs before either party schedules arrival.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- Treasury award record: 656-20-130, REPAIR BUILDING 50 BASEMENT KITCHEN, ST CLOUD, MN
- Treasury award record: "IGF::OT::IGF" DISCOVERY CENTER KITCHEN AND COUNTERTOP INSTALLATION, TAMARAC NWR, ROCHERT, MN, BECK
- FEMA historical county designation and incident dates
- FDA Food Code: model provisions; local adoption and authority must be checked
- FDA: state food-safety resources






