At a glance

Location
Rutland, Vermont
Equipment
Commercial kitchens, dishwashing and refrigeration
Setup planning
Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
Phone inquiries
Staffed 24/7
Rental terms
Short-term and extended use; exact term by quote

Plan the operating transition

  1. Which kitchen tasks need another arrangement?
  2. Who confirms the utility connections?
  3. How will removal affect reopening?

Compare equipment for your temporary kitchen

Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.

Kitchen trailer exterior — shared configuration reference. Equipment is confirmed with your quote. Compare this equipment category

28ft Mobile Kitchen reference photographs

Use Previous, Next, or the left and right arrow keys to browse. Press Escape to close.

1 / 6 — Kitchen trailer exterior — shared configuration reference

Shared configuration references. The assigned equipment and current configuration are confirmed with your quote.

Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.

28ft Mobile Kitchen

A full cooking line with a reference floor plan to inspect.

View specifications and rental pricesRequest a quoteOpens inquiry form
Conveyor washing aisle and three-compartment sink
Conveyor washing aisle and three-compartment sink — shared configuration reference. Equipment is confirmed with your quote. Compare this equipment category

38ft High-Temperature Conveyor Dish Trailer reference photographs

Use Previous, Next, or the left and right arrow keys to browse. Press Escape to close.

1 / 6 — Conveyor washing aisle and three-compartment sink — shared configuration reference

Shared configuration references. The assigned equipment and current configuration are confirmed with your quote.

Starting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.

38ft High-Temperature Conveyor Dish Trailer

A conveyor workflow with an approved reference floor plan.

View specifications and rental pricesRequest a quoteOpens inquiry form
Refrigerated trailer exterior — shared configuration reference. Equipment is confirmed with your quote. Compare this equipment category

12ft Refrigerated Trailer reference photographs

Use Previous, Next, or the left and right arrow keys to browse. Press Escape to close.

1 / 4 — Refrigerated trailer exterior — shared configuration reference

Shared configuration references. The assigned equipment and current configuration are confirmed with your quote.

Starting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.

12ft Refrigerated Trailer

A compact cold-storage option with configuration checks up front.

View specifications and rental pricesRequest a quoteOpens inquiry form

Explore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.

Past emergencies and the operating plan

Rutland County is designated in FEMA’s DR-4762-VT for severe storm and flooding during December 18–19, 2023. Check receiving, utilities and the route used to serve residents independently rather than treating a historical county designation as an inspection of the kitchen.

Construction scope before equipment selection

A June 29, 2017 White River Junction VA award describes replacement of kitchen floors. Obtain the property’s construction boundary and identify how preparation and washing continue while permanent equipment is removed or the floor is unavailable.

Renovation and the meal-service sequence

A July 11, 2014 Colchester award describes a kitchen renovation with its own scope and date.

Equipment access and placement

At the care property, map staff entry, resident delivery and used-utensil return.

Compare the complete temporary-kitchen cost

Ask providers to price the same care menu, service period and support duties. Historical flooring and renovation awards do not establish local rental rates; written proposals should identify what remains with the operator while permanent work is delayed or handed back.

Equipment reference rental rates

Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.

28ft Mobile Kitchen — rental price ranges
Customer tier1-6 Days8 Days-14 days15days-1 monthMore than 3 Months
Tier 1$5,995 to $7,995$5,995 to $8,995$5,995 to $8,995$4,995 to $8,995
Tier 2$4,995 to $7,995$4,995 to $7,995$4,995 to $7,995$4,995 to $8,995
Tier 3$4,995 to $7,995$4,995 to $7,995$4,995 to $7,995$4,995 to $7,995
Tier 4$4,995 to $7,995$4,995 to $7,995$4,995 to $7,995$4,995 to $7,995

Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.

28ft Mobile Kitchen — Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.

Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.

Rutland location reference

General geographic reference centered on the Census representative point for Rutland city. This map does not mark a company office.

Geographic name
Rutland city
State
Vermont (VT)
Land area
7.55 square miles
Reference
U.S. Census, 2025 Gazetteer

More Vermont kitchen rental locations

Before agreeing a rental or lease

Compare the complete period of use.

Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.

Why choose Water Damage Kitchen

Care meals must move reliably through preparation and service. Describe diets, washing and resident delivery before comparing configurations and permanent-work milestones.

  • Deployment coordination

    Prepare resident-meal and site details before requesting configurations.

  • 24/7 emergency inquiries

    Use the confirmed 24/7 phone to explain the interrupted care service.

  • End-to-end project support

    Coordinate floor work with preparation and washing responsibilities.

  • Flexible rental terms

    Compare rental periods against actual equipment reinstallation.

  • Heavy-duty commercial equipment

    Match cooking and holding to the residents’ meal requirements.

  • Experienced logistics coordination

    Confirm receiving, staff access and the route to resident dining.

Clear equipment details and a staffed phone

Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.

Kitchen project inquiries · 24/7

An interrupted kitchen needs a clear next step.

Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.

Project questions

Before you choose the next step

Why include equipment removal in floor planning?

It changes which preparation and washing tasks remain usable during the work. Ask the contractor to show equipment moves, work boundaries and the point when the area is released. Plan the temporary service around that sequence, including any changed access.

What should a care proposal cover?

Meal requirements, support work, term, connections, delivery and each party’s responsibilities. Describe actual diets, meal times, holding and delivery duties with the care operator. Show how food and utensils move between preparation and residents or patients, including responsibilities left with facility staff.

When should a care facility end temporary kitchen use?

Agree permanent readiness with the operator and responsible project team, including completed work, equipment checks and required operating review. Include the stock, staff and utensil transfer back, then arrange collection around that transition instead of ending the term on an assumed construction date.

What should floor sequencing show?

Show equipment removal, the work boundary, the temporary meal arrangement and reinstallation in order. Ask the contractor to identify usable routes and release milestones so washing, storage and resident service remain visible during the changes.

Who operates the care-meal arrangement?

Name the care operator and staff responsible for dietary coordination, preparation, holding, delivery and washing. Check those duties against the rental support scope so setup and equipment supply are not mistaken for staffing the meal operation.

Tell us about your kitchen

Send a project inquiry

Share your location and kitchen questions. Fields marked * are required.

Your contact and project details

Read our Privacy Policy for how the form and its inquiry workflow use your information.

Prefer to talk? Call +1-800-245-5216.

Reference resources

Sources and further information