At a glance

Location
Rochester, New York
Equipment
Commercial kitchens, dishwashing and refrigeration
Setup planning
Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
Phone inquiries
Staffed 24/7
Rental terms
Short-term and extended use; exact term by quote

Plan the operating transition

  1. Which kitchen tasks need another arrangement?
  2. Who confirms the utility connections?
  3. How will removal affect reopening?

Compare equipment for your temporary kitchen

Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.

Kitchen trailer exterior — shared configuration reference. Equipment is confirmed with your quote. Compare this equipment category

28ft Mobile Kitchen reference photographs

Use Previous, Next, or the left and right arrow keys to browse. Press Escape to close.

1 / 6 — Kitchen trailer exterior — shared configuration reference

Shared configuration references. The assigned equipment and current configuration are confirmed with your quote.

Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.

28ft Mobile Kitchen

A full cooking line with a reference floor plan to inspect.

View specifications and rental pricesRequest a quoteOpens inquiry form
Conveyor washing aisle and three-compartment sink
Conveyor washing aisle and three-compartment sink — shared configuration reference. Equipment is confirmed with your quote. Compare this equipment category

38ft High-Temperature Conveyor Dish Trailer reference photographs

Use Previous, Next, or the left and right arrow keys to browse. Press Escape to close.

1 / 6 — Conveyor washing aisle and three-compartment sink — shared configuration reference

Shared configuration references. The assigned equipment and current configuration are confirmed with your quote.

Starting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.

38ft High-Temperature Conveyor Dish Trailer

A conveyor workflow with an approved reference floor plan.

View specifications and rental pricesRequest a quoteOpens inquiry form
Refrigerated trailer exterior — shared configuration reference. Equipment is confirmed with your quote. Compare this equipment category

12ft Refrigerated Trailer reference photographs

Use Previous, Next, or the left and right arrow keys to browse. Press Escape to close.

1 / 4 — Refrigerated trailer exterior — shared configuration reference

Shared configuration references. The assigned equipment and current configuration are confirmed with your quote.

Starting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.

12ft Refrigerated Trailer

A compact cold-storage option with configuration checks up front.

View specifications and rental pricesRequest a quoteOpens inquiry form

Explore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.

Past emergencies and the operating plan

FEMA’s DR-4348-NY includes Monroe County for flooding during May 2–August 6, 2017. Check whether the present interruption affects preparation, storage, receiving, utilities or meal delivery, with the operator’s decisions retained for the actual address.

Construction scope before equipment selection

A December 14, 2023 Syracuse award describes renovation of a main kitchen. Ask the permanent team which systems and preparation tasks lose access at each phase before selecting the temporary configuration and identifying work left with the operator.

Renovation and the meal-service sequence

A September 12, 2018 Bath award describes renovation of a main kitchen in Building 34. Keep each property’s resident-service sequence, equipment installation and reopening checks distinct rather than borrowing a historical project’s assumed timeline.

Equipment access and placement

The care property's receiving, staff entry and resident-meal route still need their own agreement.

Compare the complete temporary-kitchen cost

Compare the same menu, meal periods and equipment term across proposals. Public kitchen-renovation obligations do not establish current care-facility rental prices; written terms should show included support work and the responsibilities remaining with the actual operator.

Equipment reference rental rates

Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.

28ft Mobile Kitchen — rental price ranges
Customer tier1-6 Days8 Days-14 days15days-1 monthMore than 3 Months
Tier 1$5,995 to $7,995$5,995 to $8,995$5,995 to $8,995$4,995 to $8,995
Tier 2$4,995 to $7,995$4,995 to $7,995$4,995 to $7,995$4,995 to $8,995
Tier 3$4,995 to $7,995$4,995 to $7,995$4,995 to $7,995$4,995 to $7,995
Tier 4$4,995 to $7,995$4,995 to $7,995$4,995 to $7,995$4,995 to $7,995

Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.

28ft Mobile Kitchen — Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.

Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.

Rochester location reference

General geographic reference centered on the Census representative point for Rochester city. This map does not mark a company office.

Geographic name
Rochester city
State
New York (NY)
Land area
35.76 square miles
Reference
U.S. Census, 2025 Gazetteer

More New York kitchen rental locations

Before agreeing a rental or lease

Compare the complete period of use.

Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.

Why choose Water Damage Kitchen

Resident diets and meal delivery guide the temporary arrangement. Describe that whole pathway alongside the actual permanent-work and supporting-system restrictions.

  • Deployment coordination

    Describe resident meals and building restrictions before configuration choices.

  • 24/7 emergency inquiries

    Explain the affected care service through the confirmed 24/7 line.

  • End-to-end project support

    Coordinate preparation, meal delivery and construction responsibilities.

  • Flexible rental terms

    Compare lease periods against phased return of the permanent room.

  • Heavy-duty commercial equipment

    Match cooking, holding and washing to residents’ needs.

  • Experienced logistics coordination

    Confirm staff, supplies and utensil-return movement on the site plan.

Clear equipment details and a staffed phone

Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.

Kitchen project inquiries · 24/7

An interrupted kitchen needs a clear next step.

Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.

Project questions

Before you choose the next step

Why define the meal route before equipment?

Preparation equipment must support the actual delivery and return arrangement. Identify where prepared meals are received, held and handed to users, and where utensils go afterward. Assign those duties even if the main production room is located elsewhere.

What should be checked at each work phase?

Usable rooms, shared systems, meal duties and required handover checks. Ask the contractor to show equipment moves, work boundaries and the point when the area is released. Plan the temporary service around that sequence, including any changed access.

How are proposals made comparable?

Use the same menu, term, access assumptions and supporting responsibilities. Give our team the same service duties, dates and site information, then compare itemized inclusions and exclusions. A lower equipment line can leave connections, washing, storage or removal outside the proposed price.

Which resident-meal times must be covered?

List preparation, holding and delivery windows. Describe actual diets, meal times, holding and delivery duties with the care operator. Show how food and utensils move between preparation and residents or patients, including responsibilities left with facility staff.

Who confirms the dining route?

The care operator and property team should agree the actual route from preparation to resident service and back to washing. Give our team the position and any handling constraints so the equipment arrangement can be reviewed against that movement.

Tell us about your kitchen

Send a project inquiry

Share your location and kitchen questions. Fields marked * are required.

Your contact and project details

Read our Privacy Policy for how the form and its inquiry workflow use your information.

Prefer to talk? Call +1-800-245-5216.

Reference resources

Sources and further information