At a glance
- Location
- Reno, Nevada
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
Past emergencies and the operating plan
Washoe County is designated in FEMA’s DR-4307-NV for severe winter storms, flooding and mudslides during February 5–22, 2017. Check receiving, staff access and utilities independently so a room’s condition is not used to describe the entire food-service pathway.
Construction scope before equipment selection
A March 16, 2020 Nellis AFB award concerns constructing utility support for a kitchen trailer. Ask which connections, commissioning activities and site responsibilities must be completed before the proposed temporary kitchen can support its menu and meal schedule.
Renovation and the meal-service sequence
The June 27, 2023 NAS Fallon kitchen-remodel award is a separate existing-facility scope.
Equipment access and placement
Confirm the actual unit entrance, receiving gate and path to service before agreeing delivery.
Compare the complete temporary-kitchen cost
Compare the same equipment period and supporting duties, including delivery, temporary connections, cleaning, removal and extensions. A utility-construction award does not establish a local kitchen rental rate; obtain written amounts against the actual proposed menu and site arrangement.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Reno location reference
General geographic reference centered on the Census representative point for Reno city. This map does not mark a company office.
- Geographic name
- Reno city
- State
- Nevada (NV)
- Land area
- 109.3 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More Nevada kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
Visitor-service kitchens need clear preparation and service interfaces. Bring utility duties and receiving conditions into the equipment discussion before agreeing a configuration.
Deployment coordination
Combine the meal brief with the required utility-support scope.
24/7 emergency inquiries
Describe the affected operation through the confirmed 24/7 line.
End-to-end project support
Coordinate site infrastructure and food-service responsibilities.
Flexible rental terms
Compare extensions against permanent-work and connection milestones.
Heavy-duty commercial equipment
Select cooking and washing from the actual visitor-service menu.
Experienced logistics coordination
Confirm the unit entrance and authorized receiving destination.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
Why discuss utilities before choosing equipment?
The proposed configuration needs a usable, agreed connection arrangement to support the menu. Have our team state requirements for the specific configuration, then have the responsible site specialists check available connections. Record who supplies, connects, checks and removes each temporary service.
What should site instructions include?
Placement, gate, receiver, unit access and the food-service route. Identify the entrance, authorized receiver and delivery window, then show how supplies reach preparation. Ask our team to confirm vehicle and unloading needs before either party schedules arrival.
How should infrastructure costs be handled?
Show their amounts and responsible parties separately beside the equipment term. Separate the equipment from the work needed to make its position usable. Ask for placement, connections, servicing and removal to have named owners and explicit inclusions in the proposal.
What utility work comes before use?
Have our team provide requirements for the selected configuration and the responsible site specialists confirm usable services. Assign installation and agreed checks explicitly, then schedule them before the first required preparation period.
Who receives the proposed unit?
The property should name an authorized receiver with current entry instructions and authority to resolve placement questions. Confirm who accepts the equipment and supporting work so delivery has an agreed handoff at the actual site.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- Treasury award record: BG302 REMODEL KITCHEN AT NAS FALLON, NV
- Treasury award record: CONSTRUCT UTILITY SUPPORT FOR KITCHEN TRAILER, NELLIS AFB NV
- FEMA historical county designation and incident dates
- FDA Food Code: model provisions; local adoption and authority must be checked
- FDA: state food-safety resources






