At a glance
- Location
- Portland, Oregon
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
Past emergencies and the operating plan
FEMA’s DR-4768-OR includes Multnomah County for severe winter storms, straight-line winds, landslides and mudslides during January 10–22, 2024. For a present hotel interruption, check the property’s receiving access, utilities and guest circulation separately; county history is context rather than a condition report for the kitchen.
Construction scope before equipment selection
A March 7, 2019 Estacada award describes HVAC installation for a dining-hall/kitchen facility, including refrigeration lines and air handlers. Obtain the actual Portland property’s construction boundary and identify which temporary food-service tasks rely on shared building systems.
Renovation and the meal-service sequence
A September 26, 2022 Coos Bay award concerns renovation of a fire-department kitchen and lounge. Keep cooking, guest or program service and permanent commissioning milestones distinct when writing the hotel’s own repair sequence.
Equipment access and placement
For the hotel, map guest entry separately from receiving, contractors and utensil return.
Compare the complete temporary-kitchen cost
Compare the same hotel meal periods, preparation tasks and equipment duration. Request written connections, delivery, washing, storage, cleaning, return and extension amounts, with included support duties and remaining hotel work identified.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Portland location reference
General geographic reference centered on the Census representative point for Portland city. This map does not mark a company office.
- Geographic name
- Portland city
- State
- Oregon (OR)
- Land area
- 133.49 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More Oregon kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
Hotel continuity combines meal production with guest circulation. Keep the occupied property's access and service periods visible beside the permanent repair work.
Deployment coordination
Define the hotel service that continues through the repair.
24/7 emergency inquiries
Explain the priority meal period on the confirmed 24/7 phone.
End-to-end project support
Coordinate temporary service with shared building-system work.
Flexible rental terms
Compare rental periods around uncertain permanent commissioning.
Heavy-duty commercial equipment
Choose cooking, washing and storage from the actual hotel menu.
Experienced logistics coordination
Protect guest circulation while confirming receiving and placement.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
What are the receiving restrictions?
Record them separately and define how each affects the proposed operation. Identify the entrance, authorized receiver and delivery window, then show how supplies reach preparation. Ask our team to confirm vehicle and unloading needs before either party schedules arrival.
Should HVAC interfaces appear in the brief?
Yes, where temporary food service depends on the affected system. Have our team state requirements for the specific configuration, then have the responsible site specialists check available connections. Record who supplies, connects, checks and removes each temporary service.
How are hotel proposals compared fairly?
Use the same meal duties, term, support work and access assumptions. Give our team the same service duties, dates and site information, then compare itemized inclusions and exclusions. A lower equipment line can leave connections, washing, storage or removal outside the proposed price.
Who sets the hotel service priorities?
The operator defines the meal periods that continue. Separate breakfast, restaurant, banquet and staff meals by preparation and service window. Note shared washing and storage, and ask which service takes priority if the temporary arrangement cannot support every outlet together.
Should receiving be checked separately?
Yes. Have the hotel confirm the actual receiving entrance, current vehicle conditions and route to the temporary position. Ask our team to review handling and servicing needs independently from guest entry and food-delivery arrangements.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- Treasury award record: NEW TIL PURCHASE INSTALLATION OF NEW HVAC SYSTEM DINING HALL/KITCHEN FACILITY. DEMO OUT EXISTING BA
- Treasury award record: RENOVATE FIRE DEPT KITCHEN AND LOUNGE 99 CEF B277
- FEMA historical county designation and incident dates
- FDA Food Code: model provisions; local adoption and authority must be checked
- FDA: state food-safety resources






