At a glance
- Location
- Morgantown, West Virginia
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
Past emergencies and the operating plan
FEMA lists Monongalia County in DR-4359-WV for severe storms, flooding, landslides and mudslides during February 14–20, 2018. For a current interruption, retain the property’s own assessment and distinguish problems with rooms, utilities and guest-facing access.
Construction scope before equipment selection
An October 20, 2015 award in Beaver concerns an emergency electrical call for an academy cafeteria/kitchen during a conference. The useful question is which electrical functions are unavailable and whether the proposed temporary operation depends on the same affected building systems.
Renovation and the meal-service sequence
A May 2, 2013 award describes correction of a VA kitchen floor in Huntington.
Equipment access and placement
For the hotel, mark guest circulation, food receiving and contractor movement independently.
Compare the complete temporary-kitchen cost
A hotel proposal should cover the required service periods and the supporting arrangement, including washing, storage, connections, cleaning and removal. Ask how extensions and early release are handled if permanent repairs change.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Morgantown location reference
General geographic reference centered on the Census representative point for Morgantown city. This map does not mark a company office.
- Geographic name
- Morgantown city
- State
- West Virginia (WV)
- Land area
- 10.18 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More West Virginia kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
Guest service and permanent repairs share an occupied property. Plan meal periods, receiving and circulation together before discussing a temporary configuration.
Deployment coordination
Separate hotel meal services and their preparation windows.
24/7 emergency inquiries
Use the confirmed 24/7 line to explain the priority service.
End-to-end project support
Coordinate guest operations with electrical and floor work.
Flexible rental terms
Compare extensions against the actual permanent-system return.
Heavy-duty commercial equipment
Match cooking, storage and washing to the hotel menu.
Experienced logistics coordination
Confirm receiving without obstructing guest or staff movement.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
What should a hotel record before seeking temporary equipment?
Identify the rooms and systems actually unavailable, then list the meal periods that must continue. Separate guest circulation from receiving and utensil movement so our team can review cooking, washing, storage and placement against the hotel’s current operating restrictions.
What should be shown beside a placement?
Receiving, guest movement, staff entry and the route to food service. Mark guest and staff circulation alongside food receiving, equipment access and utensil return. Ask the property to resolve conflicts before choosing a position based only on an available parking area.
How do we compare hotel kitchen rental prices?
Send our team the same priority meals, service windows, site information and expected term. Request separate amounts for equipment, delivery, setup, connections, servicing and removal, including any washing or storage supplied outside the kitchen and the conditions for extending use.
Which hotel meal period cannot stop?
State its preparation and service requirements first. Separate breakfast, restaurant, banquet and staff meals by preparation and service window. Note shared washing and storage, and ask which service takes priority if the temporary arrangement cannot support every outlet together.
Should guest circulation appear on the plan?
Yes. Mark guest entry and occupied areas alongside supplier receiving, contractor movement and used-utensil return. Have the hotel resolve conflicts with the proposed position before our team agrees equipment arrival and servicing access.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- Treasury award record: IGF::OT::IGF LABOR FOR EMERGENCY CALL TO CORRECT ELECTRICAL PROBLEMS IN CAFETERIA/KITCHEN AT NMH&S A
- Treasury award record: IGF::OT::IGF CORRECT KITCHEN FLOOR VAMC HUNTINGTON, WV.
- FEMA historical county designation and incident dates
- FDA Food Code: model provisions; local adoption and authority must be checked
- FDA: state food-safety resources






