At a glance
- Location
- Manchester, New Hampshire
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
Past emergencies and the operating plan
Hillsborough County is designated in FEMA’s DR-4209-NH for the January 26–28, 2015 severe winter storm and snowstorm. For a present interruption, document the usable receiving entrance, actual utility condition and decisions about which food-service functions may continue.
Construction scope before equipment selection
A July 28, 2009 Manchester award concerns replacement of a dietetic-kitchen floor. Ask whether equipment must be removed, how the work zone is isolated and which service tasks lose access; the permanent contractor’s sequence should come before selection of temporary cooking capacity.
Renovation and the meal-service sequence
Manchester also has a kitchen-roof restoration award dated April 9, 2024 and a storage-area mold-abatement award dated September 12, 2013.
Equipment access and placement
Ask the property contact to mark the equipment receiving entrance, usable staff route and work boundaries for each phase. Keep preparation-to-service movement and later servicing access on the same plan before agreeing the temporary position.
Compare the complete temporary-kitchen cost
Separate the equipment term from work needed to make the temporary operation usable. Request amounts for placement, utility connections, cleaning and return, then state how uncertain roof or floor handover dates affect extensions.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Manchester location reference
General geographic reference centered on the Census representative point for Manchester city. This map does not mark a company office.
- Geographic name
- Manchester city
- State
- New Hampshire (NH)
- Land area
- 33.04 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More New Hampshire kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
Floor, roof and storage work interrupt different kitchen functions. Define the meal operation first so temporary support addresses the actual restriction.
Deployment coordination
Define the meal operation and affected surfaces before deployment.
24/7 emergency inquiries
Explain the interrupted institutional service through the confirmed 24/7 phone.
End-to-end project support
Coordinate floor, roof and food-service responsibilities.
Flexible rental terms
Compare terms against actual equipment reinstallation and handover.
Heavy-duty commercial equipment
Match preparation and washing to the operator's real menu.
Experienced logistics coordination
Confirm receiving, staff movement and the path to service.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
Can roof work and floor work use one shutdown plan?
They can be coordinated, but each work area needs its own boundary, access conditions and release milestone. Ask the project team to show how the combined sequence affects preparation, washing and equipment moves before selecting the temporary operating period.
Can a floor repair require equipment relocation?
It may; ask the contractor for the actual work and isolation sequence. Ask the contractor to show equipment moves, work boundaries and the point when the area is released. Plan the temporary service around that sequence, including any changed access.
Who decides when the permanent kitchen can reopen?
The operator and responsible authorities must resolve the checks required for the actual facility. Ask the permanent-work team to identify completed work and outstanding restrictions, then agree the meal-service transition before arranging collection of the temporary equipment.
What should floor work identify?
Show equipment removal, the work boundary, the temporary meal arrangement and the return sequence in order. Ask the contractor which areas and routes are released at each phase before agreeing reinstallation and rental collection.
Who confirms utility availability?
The responsible property team must document usable systems. Have our team state requirements for the specific configuration, then have the responsible site specialists check available connections. Record who supplies, connects, checks and removes each temporary service.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- Treasury award record: REPLACE DIETETIC KITCHEN FLOOR
- Treasury award record: PROJECT NUMBER 608-24-108 - KITCHEN ROOF RESTORATION
- Treasury award record: EMERGENCY MOLD ABATEMENT KITCHEN STORAGE AREA IGF::OT::IGF
- FEMA historical county designation and incident dates
- FDA Food Code: model provisions; local adoption and authority must be checked
- FDA: state food-safety resources






