At a glance

Location
Louisville, Kentucky
Equipment
Commercial kitchens, dishwashing and refrigeration
Setup planning
Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
Phone inquiries
Staffed 24/7
Rental terms
Short-term and extended use; exact term by quote

Plan the operating transition

  1. Which kitchen tasks need another arrangement?
  2. Who confirms the utility connections?
  3. How will removal affect reopening?

Compare equipment for your temporary kitchen

Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.

Kitchen trailer exterior — shared configuration reference. Equipment is confirmed with your quote. Compare this equipment category

28ft Mobile Kitchen reference photographs

Use Previous, Next, or the left and right arrow keys to browse. Press Escape to close.

1 / 6 — Kitchen trailer exterior — shared configuration reference

Shared configuration references. The assigned equipment and current configuration are confirmed with your quote.

Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.

28ft Mobile Kitchen

A full cooking line with a reference floor plan to inspect.

View specifications and rental pricesRequest a quoteOpens inquiry form
Conveyor washing aisle and three-compartment sink
Conveyor washing aisle and three-compartment sink — shared configuration reference. Equipment is confirmed with your quote. Compare this equipment category

38ft High-Temperature Conveyor Dish Trailer reference photographs

Use Previous, Next, or the left and right arrow keys to browse. Press Escape to close.

1 / 6 — Conveyor washing aisle and three-compartment sink — shared configuration reference

Shared configuration references. The assigned equipment and current configuration are confirmed with your quote.

Starting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.

38ft High-Temperature Conveyor Dish Trailer

A conveyor workflow with an approved reference floor plan.

View specifications and rental pricesRequest a quoteOpens inquiry form
Refrigerated trailer exterior — shared configuration reference. Equipment is confirmed with your quote. Compare this equipment category

12ft Refrigerated Trailer reference photographs

Use Previous, Next, or the left and right arrow keys to browse. Press Escape to close.

1 / 4 — Refrigerated trailer exterior — shared configuration reference

Shared configuration references. The assigned equipment and current configuration are confirmed with your quote.

Starting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.

12ft Refrigerated Trailer

A compact cold-storage option with configuration checks up front.

View specifications and rental pricesRequest a quoteOpens inquiry form

Explore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.

Past emergencies and the operating plan

Jefferson County is included in FEMA’s DR-4864-KY for the April 2–May 16, 2025 severe-storm and flooding incident period. Keep the facility’s assessment, event commitments and any food-transport restrictions in an address-specific recovery record.

Construction scope before equipment selection

A May 19, 2016 Louisville award describes renovation of a base fire-house kitchen. Identify which permanent work affects preparation, storage and staff meal service before treating the proposed kitchen equipment as a complete continuity solution.

Renovation and the meal-service sequence

Kentucky’s September 6, 2022 medical-center hood replacement in Lexington shows how a narrow equipment-system change can interrupt cooking. The operating plan in Bowling Green offers a different institutional comparison.

Equipment access and placement

Catering still needs its own load-in, event-service route and return of used equipment.

Compare the complete temporary-kitchen cost

Compare proposals against the same event program: prep hours, storage, utensil washing, deliveries, setup and removal. A construction award or emergency declaration provides no local rental tariff; written provider amounts should identify included tasks, excluded work and extension conditions.

Equipment reference rental rates

Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.

28ft Mobile Kitchen — rental price ranges
Customer tier1-6 Days8 Days-14 days15days-1 monthMore than 3 Months
Tier 1$5,995 to $7,995$5,995 to $8,995$5,995 to $8,995$4,995 to $8,995
Tier 2$4,995 to $7,995$4,995 to $7,995$4,995 to $7,995$4,995 to $8,995
Tier 3$4,995 to $7,995$4,995 to $7,995$4,995 to $7,995$4,995 to $7,995
Tier 4$4,995 to $7,995$4,995 to $7,995$4,995 to $7,995$4,995 to $7,995

Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.

28ft Mobile Kitchen — Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.

Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.

Louisville location reference

General geographic reference centered on the Census representative point for Louisville/Jefferson County metro government (balance). This map does not mark a company office.

Geographic name
Louisville/Jefferson County metro government (balance)
State
Kentucky (KY)
Land area
262.84 square miles
Reference
U.S. Census, 2025 Gazetteer

More Kentucky kitchen rental locations

Before agreeing a rental or lease

Compare the complete period of use.

Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.

Why choose Water Damage Kitchen

Catering service begins before guests arrive and ends after cleanup. Include that whole period when comparing preparation, washing and equipment support.

  • Deployment coordination

    Include preparation days and event windows in the brief.

  • 24/7 emergency inquiries

    Explain the priority catering service through the confirmed 24/7 phone.

  • End-to-end project support

    Coordinate production, transport and event-service responsibilities.

  • Flexible rental terms

    Compare terms around setup, service and breakdown.

  • Heavy-duty commercial equipment

    Match cooking, storage and washing to the actual event menu.

  • Experienced logistics coordination

    Separate event load-in from food receiving and utensil return.

Clear equipment details and a staffed phone

Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.

Kitchen project inquiries · 24/7

An interrupted kitchen needs a clear next step.

Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.

Project questions

Before you choose the next step

Is production capacity the whole catering requirement?

No. Storage, transport, event service and utensil return also affect the arrangement. Include advance preparation, transport or holding, service and utensil return for the actual event. State who performs each task and when equipment must be ready, cleaned and released.

What should be included in a catering kitchen quote?

Have our team price the same advance preparation, event-service and cleanup windows, together with the proposed cooking, washing and storage arrangement. Separate transport, setup, connections and removal, and identify the support duties that the caterer or venue must supply.

What should a provider price?

The menu and event schedule, equipment term, connections, delivery, removal and agreed support duties. Give our team the same service duties, dates and site information, then compare itemized inclusions and exclusions. A lower equipment line can leave connections, washing, storage or removal outside the proposed price.

Should preparation days count in the term?

Yes, where the rental equipment is required for advance preparation. Give our team the first preparation window as well as guest service, and include washing, cleaning and equipment release when the operating period is agreed.

Who receives the event equipment?

Name the actual property's authorized receiver. Identify the entrance, authorized receiver and delivery window, then show how supplies reach preparation. Ask our team to confirm vehicle and unloading needs before either party schedules arrival.

Tell us about your kitchen

Send a project inquiry

Share your location and kitchen questions. Fields marked * are required.

Your contact and project details

Read our Privacy Policy for how the form and its inquiry workflow use your information.

Prefer to talk? Call +1-800-245-5216.

Reference resources

Sources and further information