At a glance
- Location
- Cranston, Rhode Island
- Equipment
- Commercial kitchens, dishwashing and refrigeration
- Setup planning
- Kitchens and dishwashing: about 5 hours; other units: about 1 hour. Confirm the site scope.
- Phone inquiries
- Staffed 24/7
- Rental terms
- Short-term and extended use; exact term by quote
Plan the operating transition
- Which kitchen tasks need another arrangement?
- Who confirms the utility connections?
- How will removal affect reopening?
Compare equipment for your temporary kitchen
Start with a cooking configuration, then compare washing and cold storage separately. The complete equipment list and site connections are confirmed in your quote.
Starting from $4,995 / monthEquipment reference — 15 days–1 month: Tiers 2–4; More than 3 Months: Tiers 1–4.
28ft Mobile Kitchen
A full cooking line with a reference floor plan to inspect.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $6,995 / monthEquipment reference — More than 3 Months only: Tiers 2–3.
38ft High-Temperature Conveyor Dish Trailer
A conveyor workflow with an approved reference floor plan.
View specifications and rental pricesRequest a quoteOpens inquiry formStarting from $1,895 / monthEquipment reference — 15 days–1 month only: Tiers 2–4.
12ft Refrigerated Trailer
A compact cold-storage option with configuration checks up front.
View specifications and rental pricesRequest a quoteOpens inquiry formExplore every configuration in commercial mobile kitchen trailer rentals, commercial dishwashing trailer rentals, emergency refrigeration trailer & container rentals.
A closer look
Inside a temporary kitchen
Look at the cooking, preparation and washing areas, then compare them with your menu and the proposed configuration. Select a photograph to see the full view.





Photographs show shared configurations. Confirm the assigned equipment and layout with your quote.
1. Past emergencies and kitchen continuity
FEMA's DR-4766-RI designates Providence County for severe storms and flooding, with an incident beginning January 9, 2024. Providence County's storm and flooding designation is regional history; Rhode Island's food-establishment closure guidance needs the actual incident facts and responsible review.
2. Construction and equipment interfaces
Historical Rhode Island context: a federal award signed November 5, 2025 describes a rooftop fan for a fourth-floor kitchen at Providence. A rooftop kitchen fan connects interior operation to external equipment and service access. Identify the actual system rather than assume the record applies to a rental.
3. Renovation and changeover planning
Historical Rhode Island context: a federal award signed March 1, 2021 describes camp-kitchen air-makeup-unit replacement. Ask qualified specialists to review the proposed cooking, exhaust, and replacement-air arrangement together before selecting equipment or assuming existing systems are suitable.
4. Emergency access and site coordination
Ask the operator to distinguish usable food receiving, staff access, repair activity, and proposed service visits.
5. Local rental cost questions
Request a Cranston quote separating equipment, ventilation or utility work where applicable, servicing, extensions, and removal.
Equipment reference rental rates
Compare equipment rental by duration and customer tier. Request an itemized quote for the facility address, configuration, delivery, connections and collection.
| Customer tier | 1-6 Days | 8 Days-14 days | 15days-1 month | More than 3 Months |
|---|---|---|---|---|
| Tier 1 | $5,995 to $7,995 | $5,995 to $8,995 | $5,995 to $8,995 | $4,995 to $8,995 |
| Tier 2 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $8,995 |
| Tier 3 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
| Tier 4 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 | $4,995 to $7,995 |
Delivery, setup, servicing, and minimum terms are confirmed in the quote. The figures above retain the price sheet’s duration labels; they are not daily or weekly rates. Day 7 and terms between one and three months require a quote. Taxes, collection, connections and any extras are confirmed for your project.
Compare all kitchen, dishwashing and refrigeration rental prices, including configuration-specific rates and site add-ons.
Cranston location reference
General geographic reference centered on the Census representative point for Cranston city. This map does not mark a company office.
- Geographic name
- Cranston city
- State
- Rhode Island (RI)
- Land area
- 28.35 square miles
- Reference
- U.S. Census, 2025 Gazetteer
More Rhode Island kitchen rental locations
Before agreeing a rental or lease
Compare the complete period of use.
Your quote should identify the equipment, billing period, delivery, connections, servicing, cleaning and collection in one written scope. For phased repairs, check extension notice and the charges that continue until collection. Keep permanent repairs separate from the temporary operation, and confirm who supplies each connection. An inquiry starts a discussion; availability, the assigned unit and final terms need confirmation in our written proposal.
Why choose Water Damage Kitchen
Commercial kitchen planning in Cranston needs an operating brief and equipment information for the actual facility. Link ventilation findings with the food-service brief.
Deployment coordination
Bring current operating restrictions to the timing discussion.
24/7 emergency inquiries
Contact the confirmed number at any hour.
End-to-end project support
Link ventilation findings with the food-service brief.
Flexible rental terms
Compare equipment use and extension terms in writing.
Heavy-duty commercial equipment
Check cooking, washing, and cold-storage functions separately.
Experienced logistics coordination
Verify clean receiving and service access with the property.
Clear equipment details and a staffed phone
Compare specifications, rental price bands and configuration references before requesting a quote. Our project inquiry phone is staffed 24/7, and your proposal confirms the assigned equipment and project arrangements.
Kitchen project inquiries · 24/7
An interrupted kitchen needs a clear next step.
Tell us the facility location, which preparation or cooking tasks have stopped, the next meal period and your intended dates. Bring available assessment notes, site photographs and utility information so the discussion starts with the actual problem.
Project questions
Before you choose the next step
What should be compared before choosing equipment size?
Menu, tasks, staff movement, utilities, washing, storage, dates, and the proposed site. A room name or appliance count is not a production plan. Give our team the menu, preparation sequence, peak meal period and staffing so the configuration can be reviewed against actual duties.
Who decides reopening after a flood-related closure?
The operator needs the responsible authority’s review of the actual facility under the requirements that apply to it. Ask the project team to document completed work, equipment readiness and unresolved restrictions, then agree the meal-service transition before releasing the temporary arrangement.
What should the quote identify?
Equipment, connections, servicing, extension terms, removal, responsibilities, and exclusions. Give our team the same service duties, dates and site information, then compare itemized inclusions and exclusions. A lower equipment line can leave connections, washing, storage or removal outside the proposed price.
What should be ready before the first meal?
Agree receiving, placement, utility work and the checks needed for the selected equipment, then identify who accepts each task. Include stock, staff and utensils in the changeover so the first service does not depend on unfinished setup.
Who operates the food service during the rental?
Name the food-service operator and the staff responsible for preparation, washing, storage and service. Keep those duties separate from equipment and site work, then ask our team to identify the support included in the rental proposal.
Tell us about your kitchen
Send a project inquiry
Share your location and kitchen questions. Fields marked * are required.
Read our Privacy Policy for how the form and its inquiry workflow use your information.
Prefer to talk? Call +1-800-245-5216.
Reference resources
Sources and further information
- FEMA historical declaration 4766
- USAspending historical award 36C24126N0072
- Primary award data 36C24126N0072
- USAspending historical award 15B21521PW9A20001
- Primary award data 15B21521PW9A20001
- Census county-equivalent identity
- Rhode Island Department of Health: historical flooding and reopening guidance (April 2010)
- FDA: state food-safety resources






